|
Bids Are invited for Custom Bid For Services - Installation Commissioning Of New 11Kv Lt Lines Other Associated Work For Releasing New Connection Under Jhatpat Nivesmitra Other New Connections To Be Passed From Time To Time And Lt 11 Kv Line Shifting In Deposit Schem.. - (Part-A) Supply & Erection Top Channel , Stone Pad , F Cl With Nut & Bolt , Ms Angle , Pg Cl , I Hook , Nut And Bolt All Size , Suspension Cl And Dead & Cl , Danger Board With Cl & Bolts & Nuts , Double Pole Cl , T- Channel With Cl , Lt Cl For Pcc Pole , Number Plate With Cl & Bolts , Gaurding Cl , Cross Arm Holding Cl With Bolts & Nut , Gaurding Angle , (Part-B) Carrage & Erection Carriage Of Following From Electricity Store Centretajganj Agra To Dump Site Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-70Kms.) A) St Pole 9.0/11.0/13.0 Mtr. Long , Carriage Of Following From Electricity Store Centretajganj Agra To Dump Site Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-70Kms.) B) Pcc Pole 8.5 Mtr. Long , Carriage Of Following From Electricity Store Centretajganj Agra To Dump Site Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-70Kms.) C) 16 Kva T/F , Carriage Of Following From Electricity Store Centretajganj Agra To Dump Site Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-70Kms.) D) 25/63 Kva T/F , Carriage Of Following From Electricity Store Centretajganj Agra To Dump Site Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-70Kms.) E) 100 Kva T/F , Carriage Of Following From Electricity Store Centretajganj Agra To Dump Site Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-70Kms.) F) Metering Cubical , Carriage Of Following From Electricity Store Centretajganj Agra To Dump Site Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-70Kms.) G) 11 Kv Xlpe 3×70/3×120 Sqmm Cable , Carriage Of Following From Electricity Store Centretajganj Agra To Dump Site Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-70Kms.) H) Areal Bunch Conductor.50/95/120 Sqmm. , Carriage Of Following Material From Electricity Store Centretajganj Agra To Dump Site Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-70Kms.) J) Line Material Viz. Aerial Bunch Conductor/Weasal Conductor/Dog, G.I. Earth Wire, Cross Arm, Angle, Channel, Insulators, Cl S And Other Line Material, If Required , Erection And Grouting In 1:2:4 Ratio (Cement, Sand And Bricks Balast) On Single Pole 9/11/13 Mtr. Long St Poles Including Fixing Of All Accessories For 11 Kv Line As Per Respo Norms.Labour, T &P And Carrier, Grouting Material Etc. Required For Proper Completion Of Work Shall Be Done By The Contractor At His Own Cost. , Erection And Grouting In 1:2:4 Ratio (Cement, Sand And Bricks Balast) On Double Pole 9/11/13 Mtr. Long St Poles Including Fixing Of All Accessories For 11 Kv Line As Per Respo Norms.Labour, T &P And Carrier, Grouting Material Etc. Required For Proper Completion Of Work Shall Be Done By The Contractor At His Own Cost. , Erection And Grouting In 1:2:4 Ratio (Cement, Sand And Bricks Balast) Single Pole On 8.5 Mtr. Long Pcc Poles Including Fixing Of All Accessories For 11 Kv/Lt Line As Per Respo Norms Labour, T &P And Carrier, Grouting Material Etc. Required For Proper Completion Of Work Shall Be Done By The Contractor At His Own Cost. , Erection And Grouting In 1:2:4 Ratio (Cement, Sand And Bricks Balast) Double Pole On 8.5 Mtr. Long Pcc Poles Including Fixing Of All Accessories For 11 Kv/Lt Line As Per Respo Norms Labour, T &P And Carrier, Grouting Material Etc. Required For Proper Completion Of Work Shall Be Done By The Contractor At His Own Cost. , Erection And Grouting Stay Of Ratio 1:2:4 (Cement, Sand And Bricks Balast) As Per Respo Norms Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. Grouting Material I.E. Cement, Sand, Brick Ballast/Stone Ballast Etc. Shall Be Arranged By The Contractor At His Own Cost. , Fixing Of Pole Earthing With Earth Rod (20X2500mm) As Per Respo Norms Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. , Fixing Of Earthing Of T/F 25/63/100 Kva As Per Respo Norms Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. , Laying Sagging Stringing And Binding And Jumpering Of Conductor In Lt Line As Per Respo Manual And As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T & P, Carrier Etc Reauired For Proper Completion Of Work. Acsr Weasal Conductor/Acsr Dog/Raccon Conductor , Laying Sagging Stringing And Binding And Jumpering Of Conductor In Lt Line As Per Respo Manual And As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T & P, Carrier Etc Reauired For Proper Completion Of Work. 11 Kv Xlpe 3×70/3×120 Sqmm Cable. , Laying Sagging Stringing And Binding And Jumpering Of Conductor In Lt Line As Per Respo Manual And As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T & P, Carrier Etc Reauired For Proper Completion Of Work. 50/95/120 Sqmm Areal Bunch Conductor. , Mounting Of Following T/F On Existing Double Pole/Single Pole & Making Ht/Lt Connection A) 16 Kva T/F. , Mounting Of Following T/F On Existing Double Pole/Single Pole & Making Ht/Lt Connection C) 25/63 Kva T/F. , Mounting Of Following T/F On Existing Double Pole/Single Pole & Making Ht/Lt Connection D) 100 Kva T/F. , Making Ht T Off Connection On Existing Mains Labour, T &P And Carrier Etc. Required For Proper Completion Of Work. , Installation Of D.O. Fuse Set On Double Pole , Fixing Of Lt Distribution Boxes On Already Errected Pole For Giving Supply To Consumer By Connecting Consumer Cables By Using Appropriated Alumunium Lugs Tape N & B Provided By Conractor As Per Requirement. , Erection & Commissioning Of Metering Cubical In All Respects As Per Respo Norms And Direction By Supervising Engineer. , Re- Sagging And Stringing Of Abc Conductor, Dog/Recoon & Acsr Weasel Conductor In 11Kv/ /Lt Line As Per Direction Of Supervising Engineer Including The Cost Of Arrangement Of Labour,T&P, Carrier Etc. Required For Proper Completion Of Work. , Guarding Of Ht Line By Laying, Stringing, Sagging And Binding Of 2 Nos. Parallel Gi Wire 6 Swg After Providing, Fabrication And Fixing Of Guarding Angle And Fabrication And Fixing Of X-Guards (Tillis) Of Gi Wire At Distance Of 3 Mtr. Including The Cost Of Arrangement Of Abour, T&P Etc.Required For Proper Completion Of Work. , Installation Of 11 Kv Meter Piller Box & Making Connection. , Removal Of 63/100 Kva T/F From Existing Double Pole After Opening Ht/Lt Connections And Their Carriage To 132 Kv Taj Store Agra Including Laodiing And Unloading At Both End. , Removal Of 16/25 Kva T/F From Existing Double Pole After Opening Ht/Lt Connections And Their Carriage To 132 Kv Taj Store Agra Including Laodiing And Unloading At Both End. , Dismentling And Removal Of Lt/Ht Line From Existing From Old Ht/Lt Line And Other Screp Line Material Their Carriage To 132 Kv Taj Store Agra Including Laodiing And Unloading At Both End. , Cutting Of Kharanja/Mettalic Road/Concrete Portion While Digging Pit For Erection Of Pcc/Stp Poles, Stays Rod And Giving The Exact Shape After Exicution Work As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T & P, Carrier Etc Reauired For Proper Completion Of Work.
|