|
The Subject Of The Order Is The Construction Of A Municipal Road On Plot No. 62, Wiejce District. The Scope Of The Investment Includes: • Construction Of The Road Surface, • Construction Of 10 Exits To The Property, • Construction Of Roadsides, • Construction Of Access To The Property (Sidewalks), • Recultivation Of Existing Green Areas And Development Of New Green Areas, • Height Adjustment Of Existing Surfaces, Elements (Gates, Wickets) At The Junction Of The Planned Development With The Existing One. Existing Condition: Plot No. 62 The Wiejce Precinct Includes A Road With A Dirt And Gravel Surface And Green Areas Covered With Low Grassy Vegetation. Within The Plot Where The Investment Is Planned To Be Implemented, There Are Underground And Above-Ground Utilities In The Form Of: • Telecommunications Network, • Power Network, • Water Supply Network. The Designed Road Grade Has Been Adapted To The Existing Terrain, While Eliminating Local, Slight Height Inequalities. Taking Into Account The Scope Of The Investment And The Statutory Depth Of The Underground Infrastructure, It Is Concluded That The Planned Project Does Not Cause Any Conflict With The Existing Infrastructure. Design Status The Investment Includes The Construction Of A Municipal Road On Plot No. 62, Wiejce District, With The Following Technical Parameters: • Road Class - D, • Road Category - Municipal, • Design Speed - Vp = 30 Km/H, • Road Cross-Section Type - Road, • Traffic Category - Kr2, • Load - 100 Kn/Axle, • Lane Width – 2.5 M, • Cross-Section Of The Road – One-Sided 2%, • Length – 118.59 M, • Roadside Width – 0.75 M, • Construction Of 10 Individual Exits, • Road Surface Made Of Eko Concrete Cubes, • Exit Surface Made Of Behaton Concrete Cubes, • Surface For Access To The Property (Sidewalks) Made Of Brick-Type Concrete Cubes. The Scope Of Works Is Presented In The Bill Of Quantities And Technical Documentation Attached To The Swz. Note! All Names, Trademarks And Standards Given In The Technical Documentation And Other Documents Are Exemplary And Were Used To Determine The Expected Quality Standard And Or Indicate The Expected Technical Solutions. The Ordering Party Allows The Submission Of Equivalent Offers, Which Means An Offer That Presents A Description Of The Subject Of The Order With The Same Or Better Technical, Qualitative And Functional Parameters Meeting The Minimum Parameters And Standards Specified By The Ordering Party, Marked With A Different Trademark, Standard, Patent Or Origin. Notes: A/ All General Construction Works Should Be Carried Out In Accordance With Applicable Regulations And Technical Conditions For The Execution And Acceptance Of Construction And Assembly Works Under The Supervision Of Authorized Persons. B/ All Works Construction Works Must Be Carried Out In Accordance With Construction Practice And Occupational Health And Safety And Fire Protection Regulations. And Environmental Protection.C/ The Technology For Carrying Out The Works May Be Change
|