|
The Scope Of The Order Includes: A) Preparation Of A Dendrological Inventory, Including: - A Full List Of Trees And Shrubs, - Dendrometric Measurements, - Assessment Of The Health Condition, - Indication Of Trees Requiring Treatment, - Recommendations Regarding Supplementary Plantings. B) Carrying Out Tree Stand Maintenance Treatments, Including: - Sanitary, Technical And Corrective Pruning, - Mechanical Protection (If Required), Actions Improving Habitat Conditions.C) Replenishment Of Plantings, In Line With The Historical Character Of The English Park.D) Reconstruction Of Existing Fragments Of The Fence, Maintaining The Form, Material And Color In Accordance With The Conservators Recommendations.E) Construction Of New Sections Of The Fence, In Unfenced Places, In A Form Agreed With The Provincial Conservator Of Monuments. Detailed Scope Of Work (Including The Location Of The Fence Sections, Number And Location Of Trees Treated, The Scope Of Plantings) Will Be Determined At The Design Stage Based On A Dendrological Inventory And Conservation Arrangements. F) Cleaning And Renovation Of The Existing Paving Surface, Including In Particular: Mechanical And Manual Cleaning Of The Surface Of Soil, Sand, Mud, Lichens, Moss, Weeds And Other Contaminants, Cleaning And Unblocking The Joints Between The Pavement Elements, Removal Of Vegetation Growing From The Joints And The Surface Surface, - Local Dismantling Of Damaged Or Unstable Fragments Of The Surface, - Supplementing The Missing Or Damaged Paving Elements With Material Corresponding To The Existing Surface In Terms Of Type, Dimensions, Color And Character, - Re-Arranging The Elements In Places Requiring Improvement Of The Geometry, Stability Or Evenness Of The Surface, - Completing And Restoring Joints, - Leveling And Stabilizing Local Unevenness, - Final Cleaning Of The Surface And Tidying Up The Area After The Works. Work On Paving Surfaces Should Be Carried Out While Maintaining The Existing Historical And Material Values - The Method Of Carrying Out The Works Should Be Agreed With The Provincial Conservator Of Monuments. G) Demolition Of The Existing Farm Building, Including In Particular: - Securing And Marking The Area For Demolition Works, - Preparation Of The Building For Demolition, - Disassembly Of Equipment, Joinery And Other Non-Structural Elements, - Demolition Of The Building Structure, - Demolition Of Floors And Other Elements Construction Works Related To The Facility, - Demolition Of Foundations And Other Elements Embedded In The Ground, - Segregation Of Materials And Waste Resulting From Demolition, - Loading, Transport And Transfer Of Waste For Management Or Disposal In Accordance With Applicable Regulations, - Removal Of Remains Of The Demolished Facility, - Backfilling Of The Resulting Depressions, Leveling And Tidying Up The Area. Demolition Should Be Carried Out With Particular Caution Due To The Historic Nature Of The Complex Manor And Garden. The Contractor Is Obliged To S
|