|
Quotation Are Invited For Inspection & Servicing Of 6" Gt9 &10 Ng Valve With Actuator. 6" Ball Valves W/Actuator Servicing For Gt9&10 Ng Systemvalve Specs:Size- 6-Inch Ball Valve With Actuatorcontractor Scopescope Of Wo Rk # Valve Overhaul, Testing, Painting & Actuator Servicing1.#Inspection Of Valve And Preparation Of A Quality Inspectionassessment Report With Detailed Observations And Justification.2.#Replace All Soft Seals, Gland Packing, O-Rings, Gaskets, And Othersoft Compon Ents Using A Complete Seal Kit. All Consumable Soft Goodsshall Be Supplied By The Contractor/Vendor.3.#Valve Gearboxes Shall Be Dism Antled, Inspected, Cleaned, Lubricated,Reassembled, And Serviced. Replacement Of Any Damaged Gearbox Componentsshall Be Within The C Ontractors Scope.4.#Valve Actuator Shall Be Dismantled, Inspected, Cleaned, Serviced,Calibrated, And Function Tested. Any Worn-Out Internal Parts Shall Beidentified And Reported. Replacement Of Damaged Actuator Componentsshall Be Subject To Dewa Approval Unless O Therwise Specified In The Po.A Complete Actuator Servicing Report Shall Be Submitted.5.#Ball Cleaning, Machining, And Polishing Are Part Of The Contractorsscope. If Electroless Nickel Plating (Enp) Is Required Based On Internalinspection Findings, Prior Approval Shall Be Obtained From The Dewaengineer. Enp Is Not Included In This Scope Of Work.6.#The Contractor Shall Visit The Site Prior To Q Uotation Submission Toverify Valve Condition, Dimensions, Actuator Arrangement, And Scoperequirements.7.#All Work Shall Be Completed Within Seven (07) Calendar Days From Thedate Of Valve Collection Or Site Handover.8.#A Comprehensive Valve Maintenance/Service Repo Rt, Includingphotographs Before, During, And After Overhaul, Shall Be Submitted.9.#The Valve Shall Be Subjected To Shell Test And Se At/Seal Test In Thepresence Of A Dewa Engineer. Acceptance Criteria Shall Be Zero Visibleleakage.10.#No Extra Charges Shall Be Accep Ted After Issuance Of The Purchaseorder (Po).11.#Submit All Inspection Reports Along With Supporting Photographs Andaffix A Certific Ation/Service Tag On The Valve After Successfulcompletion Of Maintenance Activities.12.#Collection Of The Valve From Site And Delive Ry Back To Site Aftercompletion Of Maintenance Shall Be Within The Contractors Scope.13.#External Valve Body Surface Preparation By Sandblasting Andrepainting Shall Be Carried Out In Accordance With The Standard Ngsystem Valve Painting Specification. Sandblasting And Painting Reportsshall Be Submitted.14.#Functional Testing Of The Valve, Gearbox, And Actuator Assemblyshall Be Carried Out Afte R Reassembly To Verify Smooth Operation, Propertravel, Torque Settings (Where Applicable), And Full Open/Closefunctionality.15.#Mult I Mobilization Is Required As Per Site Conditions.16.#Actuator Cylinder Internal Cleaning, Machining, And Polishing.17.#No Extra Cha Rges Shall Be Entertained After Purchase Orderissuance.Workmanship Warranty: Two Yearsscope Of Dewa:1. Material Pass2. Forklift##### Note To Contractors:·#Contractors Should Visit The Site To Understand The Site Conditions,Contract Scope, And Intricacies Of The Wor K To Ensure That They Fullyunderstand The Scope Of Work For Design, Engineering, And Costestimation.·#No Claims For Extra Payments S Hall Be Accepted For Any Additionalmaterials Or Works That Were Found Required At The Time Of Execution Ofthe Work Due To Lack Of Un Derstanding Of The Scope, Extent Of Work,Plant/Site Restrictions, Underestimation Of The Scope, Etc.,·#Irrespective Of Being Explici Tly Or Implicitly Mentioned In Thetender Specification Contractor Shall Note, All Technical Andengineering Requirements Essential To Complete The Scope Of Work Areincluded In This Tender Document.·#Any Ambiguities Or Discrepancies Between Contractor#S Offer And Th Istechnical Specification After Award Of The Contract Shall Be Resolved Bythe Dewa, Who Shall Then Instruct The Contractor Thereon.I Nterpretation, Change, Or Correction Made By Dewa Will Be Binding Forthe Contractor In This Regard Without Any Additional Cost To De Wa.·#No Claims For Extra Payments Shall Be Accepted For De-Mobilizationand Remobilization Or Waiting Time Or Idle Time Due To Dewa#S Operational Constraints Or Other Critical Maintenance Activities Carriedout By Dewa At The Site.Contact Info:Mohamed Binkhadim#-#Moh Amed.Binkhadim@Dewa.Gov.Aeashokgiri Gunsai#-#Ashokgiri.Gunsai@Dewa.Gov.Ae Qty: 2 Standard Terms & Conditions 1) Prices Should Be Ddp Delivery Duty Paid At Dewa Stores. 2) Quotation To Be Submitted Only In Local Currency U.A.E Dirhams 3) Dewa Standard Payment Terms Is 30 Days Credit From The Date Of Acceptance Of Material 4) No Dewa Staff Or His Or Her Relatives Up To Third Degree Should Have Ownership Or Partnership In Your Company, And Your Participation In Dewa Tenders / Rfqs Should Not Constitute A Conflict Or Perceived Conflict Of Interest. Supplier Registration: Https://Srm.Dewa.Gov.Ae/Irj/Portal/Anonymous/Regis Tender Link : Https://Srm.Dewa.Gov.Ae/Sap/Opu/Odata/Sap/Zsrm_Rfx_Reg_Bid_Srv/Attachmentset(2332602479)/$Value
|