|
Bids Are invited for Custom Bid For Services - Kandla- Dyke Drain Valve And Instrumentation Works - S/L Cab 12Px1.5Mm2cables :Supplying, Laying; Testing And Commissioning Of 1.1 Kv Grade Cables ;Pvc Insulated (Fire Retardant Low Smoke) ; Pvc Sheathed; Armoured Copper Conductor Cables Of Following Sizes As Per Is:1554 (Part-I), And Sealed Properly With Pvc Caps In Built-Up Ready Made Trenches; Overhead Cable Trays;Pull Through Pipes Or Exposed On Wall .Beam/Rakes; Trusses Tie/Beamor Embedded In Floor Or Buried Directly Underground (Excavation, Sand And Bricks Shall Be Paid Under Seperate Item Of Boq) Or Through G. I.Pipe.Unit Rates Quoted For Installationof Cables Shall Be Same Irrespective Of Route And Method Of Laying. The Rates Shall Include Laying, Pulling Of Cables, Proper Dressing Of Cables On Cable Trays, Racks, Vertical Raceways And Supply And Installation Of Saddles, Spacers And Nylon Chord For Tying As Required,Identification Tags At Strategic Points/ Every 50 Meter Intervales,Aluminium Cl S. Etc. Cable Identification Tags At Strategic Points/ Every 50 Meter Interval For Identification Of Cable; Etc. Complete.The Straight Through Joints/ Tying With Armour In The Cables Should Be Avoided.Procedure For Laying Of Lt Cables.Makes/Specifications , S/L Cab 2Px1.5Mm2cables :Supplying, Laying; Testing And Commissioning Of 1.1 Kv Grade Cables ;Pvc Insulated (Fire Retardant Low Smoke) ; Pvc Sheathed; Armoured Copper Conductor Cables Of Following Sizes As Per Is:1554 (Part-I), And Sealed Properly With Pvc Caps In Built-Up Ready Made Trenches; Overhead Cable Trays;Pull Through Pipes Or Exposed On Wall .Beam/Rakes; Trusses Tie/Beamor Embedded In Floor Or Buried Directly Underground (Excavation, Sand And Bricks Shall Be Paid Under Seperate Item Of Boq) Or Through G. I.Pipe.Unit Rates Quoted For Installationof Cables Shall Be Same Irrespective Of Route And Method Of Laying. The Rates Shall Include Laying, Pulling Of Cables, Proper Dressing Of Cables On Cable Trays, Racks, Vertical Raceways And Supply And Installation Of Saddles, Spacers And Nylon Chord For Tying As Required,Identification Tags At Strategic Points/ Every 50 Meter Intervales,Aluminium Cl S. Etc. Cable Identification Tags At Strategic Points/ Every 50 Meter Interval For Identification Of Cable; Etc. Complete.The Straight Through Joints/ Tying With Armour In The Cables Should Be Avoided.Procedure For Laying Of Lt Cables.Makes/Specifications , Dyke Drain Sil Certified Proximity Switch , 12 Cs#150 Gate Valve , S/I 9M Da Octa Polesupply, Installation, Testing And Commissioning Of The Following Types Of Gi Octagonal Poles For Street Lights With The Sizes Of The Poles Given Below Including Provision Of Holes For Cable Entry, Earthing Points On Poles, Base Template, Grouting Bolts All Civil Works Like Excavation, Pcc, Supply And Fixing Of Cable Protection Pipes Disposing Of Surplus Earth, Providing Shoring, Shuttering And Dewatering, If Required And Including Supply Of Cement, Steel, Pipes, Base Plates, Paint And All Sundry Materials Including All Materials And Labour. Street Light Fittind Would Be Measured And Paid Under Seperate Item Of Boq. Civil Work To Be Paid Seperately. , Excv<1.5 Ord Dis In Earth Work In Excavation Upto Required Depth Below Existing Ground Level Upto Required Depth Including Removal Of Vegetation,Shrubs And Debris Cutting And Dressing The Sides In Slopes And Bottom, Levelling, Grading And Ramming Of Bottoms, Bailing Out Of Water , Supplying Of Temporary Supports To Existing Services Line Like Water Pipes,Sewage Pipes,Electric Overhead And U/G Cables Etc All If Encountered, Shoring, Strutting And Disposal Of Excavated Earth Anywhere Inside Bpcls Premises As Directed By The Engineer In Charge, Complete. Payment Shall Be Made As Per The Actual Measurement But Not More Than Excavation Plan.Also No Payment Would Be Made For Extra Excavation For Making Slopes Etc.The Excavated Earth To Be Spread In Loose 150 Mm Thick Layers, Watered, Rolled Andwell Consolidated Using Suitable Compactors.The Density To Be Achieved Shall Not Be Less Than 90% Of The Density Obtained In The Laboratory (Modified Proctor Method) (Payment Against This Item Shall Be Released Only For The Earth Being Disposed Inside Bpcl Premises) , Rcc Plin 1:1.5:3 Cssupplying And Laying In Postion Rcc Of Specified Nominal Mix Using 20Mm Anddown Size Graded Crushed Stone Aggregate In Sub Structure Of All Types E.G. Trenches, Culverts, Manholes, Pipe Encasement, Catchpits, Drains, Pits, Etc.,Including Placing Of Concrete,Supplying Pockets,Openings, Recesses,Chamfering Wherever Required Etc., Vibrating, T Ing, Curing Andrendering If Reqd. To Give A Smooth And Even Surface Etc. All Complete(Excluding The Cost Of Reinforcement, But Including The Cost Of Centringand Shuttering)For All Depths Below And Upto Plinth Level In Any Shape,Position, Thickness Etc. All Complete As Specified And Directed. Onlysteel Shuttering Will Be Used So As To Obtain Required Finish. Theheight Of Shuttering Shall Not Exceed 1.5 M Per Lift Of Concrete.: 1:1.5:3 (1 Cement: 1.5 Coarse Sand: 3 Grade Stone Aggregate 20 Mm Nominal Size) , Supplying And Placing Hysd Steel Reinforcement Of Grade 500 (Tmt) Conforming To Is 1786 In Position For Rcc Worksincluding Straightening, Cutting, Bending, Placing In Position Andbinding With 16 Swg Black Soft Annealed Binding Wire At Everyintersection, Supplying And Placing Appropriate Cover Block All Completeincluding Cleaning And Making It Free From Oil, Grease Etc. Complete-For All Heights And Depths And Conforming To Relevant Is Code (Make: Sail,Tata, Jsw, Essar, Vizag Steel Or Approved Equivalent Make Conforming To Is Code) , Supply And Erecting High Tensile Ms Foundation Bolts Of Specified Dia. And Length Including Check Nuts, Washers Etc. In Foundations, Columns Etc. Including 1 Coat Of Bituminous Primer, Greasing Exposed Metal Surfaces, Threading, Covering Bolts And Packing The Sleeves With Jute Cloth Etc. As Directed. , S/I/T/C Of Flp Hooters And Red Alarm Light On Octa Pole With Separate Control Cable Input - 240 V Ac Input , S/L Cab 36Cx1.5Mm2cables :Supplying, Laying; Testing And Commissioning Of 1.1 Kv Grade Cables ; Pvc/Xlpeinsulated; Pvc Sheathed; Frls Armoured Copper Conductor Cables Of Following Sizes As Per Is:1554 (Part-I), Is 7098 Part I & Is 1225-Latest Version And Sealed Properly With Pvc Caps In Built-Up Ready Made Trenches; Overhead Cable Trays;Pull Through Pipes Or Exposed On Wall .Beam/Rakes; Trusses Tie/Beamor Embedded In Floor Or Buried Directly Underground (Excavation, Sand And Bricks Shall Be Paid Under Seperate Item Of Boq) Or Through G. I.Pipe.Unit Rates Quoted For Installationof Cables Shall Be Same Irrespective Of Route And Method Of Laying. The Rates Shall Include Laying, Pulling Of Cables, Proper Dressing Of Cables On Cable Trays, Racks, Vertical Raceways And Supply And Installation Of Saddles, Spacers And Nylon Chord For Tying As Required,Identification Tags At Strategic Points/ Every 50 Meter Intervales,Aluminium Cl S. Etc. Cable Identification Tags At Strategic Points/ Every 50 Meter Interval For Identification Of Cable; Etc. Complete.The Straight Through Joints/ Tying With Armour In The Cables Should Be Avoided.Procedure For Laying Of Lt Cables.Makes/Specifications , S/L Cab 4Cx1.5Mm2cables :Supplying, Laying; Testing And Commissioning Of 1.1 Kv Grade Cables ; Pvc/Xlpeinsulated; Pvc Sheathed; Frls Armoured Copper Conductor Cables Of Following Sizes As Per Is:1554 (Part-I), Is 7098 Part I & Is 1225-Latest Version And Sealed Properly With Pvc Caps In Built-Up Ready Made Trenches; Overhead Cable Trays;Pull Through Pipes Or Exposed On Wall .Beam/Rakes; Trusses Tie/Beamor Embedded In Floor Or Buried Directly Underground (Excavation, Sand And Bricks Shall Be Paid Under Seperate Item Of Boq) Or Through G. I.Pipe.Unit Rates Quoted For Installationof Cables Shall Be Same Irrespective Of Route And Method Of Laying. The Rates Shall Include Laying, Pulling Of Cables, Proper Dressing Of Cables On Cable Trays, Racks, Vertical Raceways And Supply And Installation Of Saddles, Spacers And Nylon Chord For Tying As Required,Identification Tags At Strategic Points/ Every 50 Meter Intervales,Aluminium Cl S. Etc. Cable Identification Tags At Strategic Points/ Every 50 Meter Interval For Identification Of Cable; Etc. Complete.The Straight Through Joints/ Tying With Armour In The Cables Should Be Avoided.Procedure For Laying Of Lt Cables.Makes/Specifications , Ex-D Gas Group Iia, Iib Start Stop Push Button Station - Field Control Of Visual Alarm On Octapole , Flp Junction Box 14Supply And Installation Of Ex-D Gas Group Iia, Iib Flp And Wp Junction Box: 340 Dia Multiway Junction Box With Maximum 18 Entries Upto 1 Et With Maximum Entry Three On Three Sides (Top Entry Not To Be Given). , Integration With Control Room Plc. This Includes Supply And Installation Of All Contractors, Relays, Cables, Visual And Audio Indicators Etc Required For Creating Logic Control Wiring Inside Honeywell Automation Plc
|