|
1. The Subject Of The Order Is The Construction Of A School Playground At The Primary School Umiastów In The Ożarów Mazowiecki Commune On The Plot No. 61/9, District 0023 Umiastów, Ożarów Mazowiecki Commune2. The Scope Of The Order Includes, Among Others: Construction Of School Sports Fields, Running Tracks, Long Jumps, High Jumps Along With Infrastructure. On The Plot With Registration Number 61/9 Located In The Town Of Umiastów, Ożarów Mazowiecki Commune, The Following Were Designed: 1) Football Pitches With An Artificial Grass Surface, 2) Multi-Functional Pitches (Two For Basketball, Tennis, Volleyball, Handball) With A Polyurethane Surface, 3) A Long Jump With A Polyurethane Surface, 4) A High Jump With A Polyurethane Surface Polyurethane With A Ski Jump,5) 60M Track With A Polyurethane Surface (80M Track Including The Start And Run Zone),6) Small Architectural Objects - Benches, Waste Bins, Regulation Board, Bicycle Racks,7) Ball Catches 5M And 6M High With A 1.2M Wide Gate And A Gate With Dimensions 3X3m - Pitch Equipment,8) Lighting For Pitches, Ski Jumps And Track - Equipment,9) Goals, Basketball Baskets, Volleyball Posts - Equipment,10) Construction Of A Fence Made Of Welded Panels, Approximately 1.7M High Along The Plot Boundaries, Along With A 1.2M Wide Gate And A 4M Wide Sliding Gate,11) Construction Of Concrete Walkways - Hardening The Area, 12) Cutting Down Trees And Making Replacement Plantings, 13) Installing Lighting For Sports Fields, Ski Jumps And Running Tracks, 14) Installing A Pump Power Supply For Rainwater Tanks, 15) Installing A Rainwater Drainage System With Drainage And Tight Rainwater Tanks, 16) Construction Of An Electrical Connection, 17) Reconstruction Of The Medium Voltage Network 3. A Detailed Description Of The Scope Of The Subject Of The Order Is Included In Annex No. 1 To The Swz, Which Includes In Particular: 1) Technical Design 2) Architectural And Construction Design 3) Electrical Conflict Removal Design 4) Land Development Design 5) Greenery Inventory 6) Bill Of Quantities 7) Technical Specification For The Execution And Acceptance Of Construction Works The Contractor Is Obliged To Check The Bill Of Quantities (It Is Only An Auxiliary Material). The Project Plays A Superior Role Over The Bill Of Quantities. The Offer Should Be Prepared Based On The Attached Project. The Bill Of Quantities Does Not Constitute The Basis For Calculating The Final Offer Price In The Offer4. The Scope Of The Subject Of The Order Also Includes: 1) Geodetic Services To The Extent Necessary To Implement The Subject Of The Order 2) Preparation Of As-Built Geodetic Documentation 3) And All Elements Listed In Any Part Of The Studies Constituting Annex No. 1 To This Specification Of Terms Of Procurement (Swz) And Affecting The Offer Price Of The Subject Of The Order 5. The Ordering Party, In Accordance With Art. 100 Paragraph 1 Of The Public Procurement Act, Requires That The Subject Of The Contract, As A Contract Intended For Use By N
|