|
1. Subject Matter Of The Order1) The Subject Of The Order Is The Implementation Of Construction Works As Part Of The Task Construction And Expansion Of The Water Supply Network In The Łask Commune, Divided Into Three Parts: A) Part I. (Ro.271.39.2026) - Construction Of The Water Supply Network On The Municipal Road In Łask (Division No. 299/2, 294/1, District 3); B) Part Ii. (Ro.271.41.2026) - Expansion Of The Water Supply Network In The Area Of Rokitnica, Plots No. 14/1, 14/2, 33/2, 16/11, 16/10 As Part Of The Budget Task Entitled: Expansion Of The Water Supply Network In The Łask Commune; C) Part Iii. (Ro.271.42.2026) - Expansion Of The Water Supply Network In The Area Rokitnica, Plots No. 230 And 237/18 As Part Of The Budget Task Entitled: Expansion Of The Water Supply Network In The Łask Commune.2) A Detailed Description Of The Subject Of The Contract, Which Should Be The Basis For Submitting An Offer, Is Specified In: A) Annex No. 6A To The Swz - Template Of The Contract To Part I, B) Annex No. 6B To The Swz - Template Of The Contract To Part Ii, C) Annex No. 6C To The Swz - Template Of The Contract To Part Ii, D) Annex No. 7A To Swz - Design Documentation To Part I, E) Annex No. 7B To Swz - Design Documentation To Part Ii, F) Annex No. 7C To Swz - Design Documentation To Part Iii.3) Note Applies To All Parts Of The Order. The Integration Of The Constructed Water Supply Networks Into The Main Network Should Be Carried Out Under The Supervision Of Mpwik Sp. Z O. O. In Łask;2.Description Of The Part Of The Order, If The Ordering Party Allows The Submission Of Partial Offers1) Construction Of A Water Supply Network On A Municipal Road In Łask (Division No. 299/2, 294/1, District 3) - Part I. (Ro.271.39.2026): Pehd100 Pn10 Sdr17 Ø 110X6.6 Mm With A Total Length Of Approx. 247.75 M, - Installation Of Fire Hydrants. Aboveground Ø 80 Mm - 2 Pcs., - Installation Of A Gel Valve. Flange Dn100 Mm - 1 Piece, - Reconstruction Works, - Quality Control. B) The Implementation Of The Investment Task Will Be Based On The Notification Of Construction Works Accepted Without Comments Or Objections Of September 1, 2026, Reference Number: Ab.6743.2.77.2026.Kz132) Construction Of A Water Supply Network With A Length Of Approximately 189 Meters In The Village Of Rokitnica (Plot No. Possibly 14/1, 14/2, 33/2, 16/11, 16/10 Rev. 0019 Rokitnica) – Part Ii. (Ro.271.41.2026):A) The Following Works/Activities Are Expected To Be Performed As Part Of The Subject Of The Order: - Preparatory Works, - Earthworks, - Assembly Works: Water Supply Network Made Of Pehd100 Pn10 Sdr17 Pipes Ø 110X6.6 Mm With A Total Length Of Approx. 188.70 M, - Installation Of Fire Hydrants. Underground Ø 80 Mm - 2 Pcs., - Installation Of A Gel Valve. Flanged Dn100 Mm – 1 Pc., - Installation Of Gel Gate Valves. Flanges Dn150 Mm - 1 Pc., - Reconstruction Works, - Quality Control. B) The Implementation Of The Investment Task Will Be Based On The Notification Of Construction Works Accepted Without Comme
|