Preparation Of Design Documentation For The Task Titled: Reconstruction Of The District Road No. 1115W In The Town Of Młodynie Dolne. 1.Description Of The Existing Conditionthe District Road No. 1115W Przytyk - Kożuchów - To The National Road No. 48 On The Section Of The Town Of Młodynie Dolne Is A Through Road With A Road Cross-Section With Shoulders, Ditches And Green Areas On Both Sides, The Road Width Is 5.00 M. The Beginning Of The Study Is Located At The Height Of Plot No. 523 (First Buildings In The Town Of Młodynie Dolne) And The End At The Height Of Plot No. 14 (Intersection With District Road No. 1112W). The Width Of The Road Is From 12.0 M To 14.0 M. The Road Along The Length Of The Reconstruction Runs Through Built-Up Areas. On The Section Planned For Reconstruction, The District Road Forms One Intersection With A Paved Municipal Road. There Is Technical Infrastructure In The Road Area. The Scope Of The Study Is Marked In Annex No. 2B. Mileage Of Reconstruction: From Km 7+450 To Km 8+650, The Length Of The Section To Be Reconstructed Is Approx. 1200 M. 2. Design Assumptions2.1. Design Data: As Part Of The Reconstruction, A Pedestrian Sidewalk Should Be Designed Located Directly Next To The Road, Along With Entrances To The Property. Road Drainage Should Be Designed Within The Road Area. A New Project For Permanent Traffic Organization Should Be Developed For The Whole. 2.1.2 Road Drainage:1. Due To The Existing Ditches And Green Areas, Drainage Should Be Planned Using Them. - If It Is Not Possible To Drain Water In The Above-Mentioned Manner, Other Technical Solutions Should Be Proposed.2.2 The Documentation Should Be Prepared In Accordance With Applicable Regulations And Principles Of Technical Knowledge.2.3 The Design Documentation Should Be Prepared In A Complete State From The Point Of View Of The Purpose It Is To Serve.2.4 The Design Documentation Will Be The Basis For The Implementation Of Construction Works.2.5 The Design Documentation, Bill Of Quantities And Technical Specification For The Execution And Acceptance Of Works Should Be Prepared In Accordance With The Principles Set Out In The Ministers Regulation Infrastructure Development And Technology Of December 20, 2021 On The Detailed Scope And Form Of Design Documentation, Technical Specifications For The Execution And Acceptance Of Construction Works And The Functional And Utility Program. The Bill Of Quantities Should Take Into Account The Maximum Possible Consolidation Of Individual Construction Works. At The Stage Of Preparing The Bill Of Quantities, It Is Required To Make Arrangements With The Ordering Party Regarding The Form, Scope Of The Bill Of Quantities And The Method Of Consolidating The Bill Of Quantities Items.2.6. The Investors Cost Estimate Should Be Prepared In Accordance With The Regulation Of The Minister Of Infrastructure, Development And Technology Of December 20, 2021 On Determining The Methods And Basis For Preparing The Investors Cost Estimate, Calc
Contact Information
Address
District Public Roads Authority In Białobrzegi,Białobrzegi,26-800,Mazowieckie,Pl921 - Radomski
Contact No.
486132338
Email
pzdpbialobrzegi@post.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 118896575
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.