|
Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Commercial; Electrical System Or Installation; Semi-Turnkey - Cartage Of Pole & Material From Store Centre From Any Other Place To The Respective Site Of Work Through The Kachha Pacca Road Inclading The Work Of Its Loading & Unloading At The Respective Ends Also Including The Work Of Dragging Etc. And Also Including The Cost Of Labour, T&P Carrier Etc. Required For Proper Completion Of Work. , Pcc Pole 8.5 Mtr Long , 11 Kv 3X70 Sqmm Xlpe Cable 2X290 , Distribution Transformer 11/0.4 63 Kva , Safe Cartage Of Line Material Viz. Conductor, Gi Earth Wire, Cross Arm, Angle, Channel, Insulator, Abc, Lt Cable And Other Line Material From Store Centre Or From Any Other Place To The Respective Site Of Work Through The Kachha Pacca Road Including The Work Of Its Loading & Unloading At The Respective Ends Also Including The Work Of Dragging. , Erection Of Double Pole (8.5 Mtr Pcc) Including Complete. H.T/L.T Fittings As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. , Grouting Of Double Pole (8.5 Mtr Pcc) Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work.(All Civil Material Shall Be Arranged By Contractor On His Own Cost) , Erection And Grouting Of 11 Kv Stay Set Completed Including The Work Of Nozelling Etc. As Per Respo Manual And Also Including The Cost Of All Grouting Material, Labour, T&P Etc Required For Proper Completion Of Work. (All Civil Material & Cl S Shall Be Arranged By Contractor On His Own Cost) , Erection And Grouting Of Stay Set Completed Including The Work Of Nozelling Etc. As Per Respo Manual And Also Including The Cost Of All Grouting Material, Labour, T&P Etc Required For Proper Completion Of Work. (All Civil Material & Cl S Shall Be Arranged By Contractor On His Own Cost) , Laying, Sagging And Binding & Jumpring Of Acsr Weasel Conductor Conductor As Per Direction Of Supervising Engineer. It Including The Cost Of Labour T&P Carrier Etc Required For Proper Completion Of Work. , Laying Of 11 Kv 3X70 Sqmm Xlpe Cable 2X290 By Digging Of Hdd Method With Hdpe Pipe (All Civil &Hdpe/Gi Pipe Material Shall Be Arranged By Contractor On His Own Cost) , Laying Of Lt Pvc Cable 3.5X70 Sqmm By Complete As Per Norms Complete In All Respect As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. , Fixing & Commisioning Of Earthing For Transformer Complete As Per Norms Complete In All Respect As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. , Fixing & Commisioning Of Distribution Transformer 11/0.4 63 Kva Complete As Per Norms Complete In All Respect As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. , Fixing & Commisioning Of Earthing Rod Complete As Per Norms Complete In All Respect As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. , Fixing & Commisioning Of Stone Pad 300X300x75mm Complete As Per Norms Complete In All Respect As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. , Fixing & Commisioning Of Smc Fuse Set For 63 Kva Tf (L/S) As Per Norms Complete In All Respect As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. (Smc Fuse Set Shall Be Arranged By Contractor On His Own Cost) , Fixing & Commisioning Of 7X70 H/S 11 Kv Jointing Kit As Per Norms Complete In All Respect As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. (Jointing Kit Shall Be Arranged By Contractor On His Own Cost) , Fabication Of Hardware Items
|