Reconstruction Of The Bridge On The Road On Plot No. 120, No. 53, No. 49/2 At Km 0+140 In Długopol Górne, District No. 0002, Registration Unit 020810_5 Międzylesie - Rural Area, In The Form Of A Three-Span Bridge, With A Rigid, Orthotropic Structure. 2. A Detailed Description Of The Subject Of The Order Is Presented In Annex No. 1 - Opz To Swz. 3. Attachments: Attachment No. 9 - Technical Design And Stwior, Attachment No. 10 - Bill Of Quantities (.Pdf) Attachment No. 11 - Bridge Location, Attachment No. 12 - Bridge Location, Attachment No. 13 - Designed Reinforced Concrete Armor On The Body Walls, Attachment No. 14 - Details Of Supporting The Bridge Spans On Piers, Attachment No. 15 - Longitudinal Section Bridge, Annex No. 16 - Declarations On Carrying Out A Site Visit. 4. The Bill Of Quantities Is An Auxiliary Material For Determining The Price Of The Contract And Should Be Verified In Terms Of Compliance With The Actual State By The Contractor During A Field Visit. 5. All Proper Names Of Devices And Materials Specified In The Bills Of Quantities, Descriptions, Technical Specifications, Etc. Are Used To Determine The Standard And Technical Properties And Should Be Treated As Auxiliary In The Process Of Preparing The Offer. It Should Be Understood That In All Such Cases Such Indications Are Accompanied By The Words Or Equivalent. However, The Devices And Materials Used By The Contractor To Implement The Subject Of The Order Cannot Have Technical Parameters And Properties Worse Than Those Specified In The Tender Documents. The Commencement Of The Execution Of The Subject Of The Order Will Begin After The Implementation Of Changes In The Traffic Organization In The Road Area Covered By Construction Works. During The Period When The Section In Question Is Closed To Traffic, Access To Adjacent Properties Or Side Roads Leading To Them Must Be Ensured At Each Stage Of The Works. Earthworks Can Begin After The Above-Ground And Underground Infrastructure Facilities Have Been Fully Identified, Marked And Secured. 6. If, During The Works, Underground Facilities Not Included In The Documentation Or Design Inventory Are Found, The Works Should Be Stopped, The Excavation Secured And The Ordering Party And The Appropriate Units Notified. 7. The Execution Of The Subject Of The Order Will Be Accepted By A Commission Appointed By The Mayor Of The City And Commune Of Międzylesie. The Final Acceptance Report Will Be Supplemented With A Complete Set Of Documentation Provided For In The Scope Of Execution Of The Subject Of The Order. 8. Purchased And Installed Materials Must Comply With Polish Standards And The Requirements Specified In Art. 10 Of The Construction Law Of July 7, 1994 (Consolidated Text: Journal Of Laws Of 2026, Item 524), Art. 5 Of The Act Of April 16, 2004 On Construction Products (Journal Of Laws Of 2021, Item 1213). The Contractor Is The Owner And Producer Of All Waste Generated As A Result Of Construction Works. At Each Stage Of The Works, Access
Contact Information
Address
Town And Municipal Hall In Międzylesie,Międzylesie,57-530,Dolnośląskie,Pl517 - Wałbrzyski
Email
urzad@miedzylesie.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 118853988
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.