Preservation Services Of Historical Buildings – Engineering Services Restoration - Renovation Of Council Hall Cr. The City Of Castrop-Rauxel Is Planning To Renovate The Listed Council Chamber. The Council Chamber Comprises A Total Of Two Floors (Entrance And Ground Floor) With A Floor Area Of Around 765 M². On The Entrance Floor There Is An Exhibition Area/Tour As Well As The Tribune Area Of The Council Chamber. On The Ground Floor There Is The Actual Council Chamber (Approx. 170 M²) As Well As Various Storage/Technical Rooms, Sanitary Facilities And A Tea Kitchen. Planned Interventions In Neighboring Areas, Such As The Toilets In The Corridor Connecting To The Town Hall, Must Be Included In The Planning. The Aim Of The Measure Is To Upgrade The Buildings Energy, Functionality And Technology To The Current State Of The Art While Strictly Preserving Its Historical Appearance. This Requires The Renovation Of The Individual Components That Are Under Monument Protection. Requirements For Monument Protection And Handling Of Building Pollutants: The Entire Building Is Completely Under Monument Protection. In The Course Of The Building Renovation, The Main Components To Be Worked On Are: - Renovation Of The Roof Structure Including Restoration Of The Grp Roof Elements, - Renovation Of The Outer Facade (Post-Beam Construction) Including Replacement And Energetic Upgrade Of The Glazing, - Restoration Of The Internal And External Facade (Metal Panels), - Restoration Of The Coffered Ceiling In The Mens Toilet And Womens Toilet In The Passage To The Council Chamber, - Natural Stone Floor In The Council Hall Circulation, - Lighting Elements (Ceiling Lights), - Interior Preparation: Seat Cushions Made Of Leather, Railing Handles / Handrails Made Of Leather, Council Hall Tables (Varnish). For The Restoration / Preparation Of The V. G. Components And Interior Items Require Close Coordination With The Commissioned Architectural Office And The Lower Monument Authority. Plans With Permissible Component Openings Are Provided By The Architecture. All Interventions In The Building Structure Must Be Reduced To A Structural Minimum. The Restorer Must Take The Results Of The Pollutant Sampling Into Account When Drawing Up Dismantling And Disposal Concepts (The Report Will Be Handed Over After The Order Has Been Awarded). Despite The Buildings Age, Dating Back To The 1970S, Building Pollutants Were Only Found In Isolated Locations. Service Content The Planning Services Of A Specialist Restorer Must Be Provided Based On Service Phases 3 To 8 In Accordance With §§ 33 Ff. Hoai. The Service Content Includes The Basic Services Of Service Phases 3 (Design Planning) To 8 (Object Monitoring) For The Services Of The Components For The Restoration Of The Grp Roof Elements, The Restoration Of The Internal And External Facade (Metal Panels), The Restoration Of The Coffered Ceiling In The Mens Toilet And Womens Toilet In The Passage To The Council Hall, The Natural Stone Floor In The Council Hall Circulation, The Lighting Elements (Ceiling Lights) And The Preparation Of The Interior (Leather Seat Cushions And Handrails, Varnish Of The Council Hall Tables). For The Components For The Renovation Of The Roof Structure
Contact Information
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 118700833
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.