. The Subject Of The Order Are Construction Works Consisting Of: 4.1.1. Reconstruction Of The Roof On The Dormitory Building, Which Consists Of The Following Elements: 1. Demolition Works Consisting Of Dismantling Gutters From Unusable Sheet Metal. Dismantling Downspouts From Unusable Sheet Metal. Dismantling Sheet Metal Flashings Of Fire Walls, Eaves, Cornice Collars, Etc. From Unusable Sheet Metal. Dismantling Roofing. From Roofing Felt On A Concrete Roof, 2. Concrete Worksinstallation Of Reinforced Concrete Beams And Joists With A Ratio Of The Length Of The Formwork Perimeter To The Beam Cross-Section Of Up To 8 M/M2. Reinforcement Of Reinforced Concrete Structures Of Buildings And Structures With Round Ribbed Steel Bars Of 8-14 Mm. Reinforcement Of Reinforced Concrete Structures Of Buildings And Structures With Smooth Round Steel Bars Of Up To 7 Mm.3. Roof Works. Construction Of A Roof Structure From Saturated Timber, Battens, Wood Cross-Section Exceeding 180 Cm2. Construction Of A Roof Structure From Saturated Timber, Short Foundations Up To 2 M Long, With A Wood Cross-Section Up To 180 Cm2. Construction Of A Roof Structure From Saturated Sawn Timber, Replacement And Struts, With A Wood Cross-Section Up To 180 Cm2. Construction Of The Structure. Roof Made Of Saturated Timber, Ordinary Rafters With A Length Of Over 4.5 M And A Cross-Section Of Wood Of Over 180 Cm2. Execution Of Cladding The Roof Slopes With Battens Made Of Saturated Timber 38 X 50 Mm With A Batten Spacing Of 16 Cm To 24 Cm. Execution Of Cladding The Roof Slopes With Counter-Battens. Execution Of Damp-Proof And Waterproof Insulation With Polyethylene Vapor Barrier Foil. Roof Covering With 0.75 Mm Thick Coated Trapezoidal Steel Sheet T 35X188s On Battens Or Formwork. Installation Of Sheet Metal Flashing From Coated Sheet With An Expanded Width Of Over 25 Cm (Orgbud W-Wa). Installation Of Semi-Circular Roof Gutters Made Of Polyvinyl Chloride With A Diameter Of 150 Mm. Joints With Glue (Orgbud W-Wa)Installation Of Round Downpipes With A Diameter Of 100 Mm Made Of Polyvinyl Chloride (Orgbud W-Wa)The Above Works Require The Installation Of An External Tubular Scaffolding With A Height Of Up To 15 M.4. Complementary Worksconstruction Of The Roof Soffit - Saiding Panelsbrick Up The Chimneys To A Height Of 50.00 Cm Above The Roof Surface With Clinker Bricks.Lay Gres Stoneware Tiles On Adhesive Mortars.Prepare Old Substrates For Insulation Using The Light-Wet Method By Mechanical Cleaning And Washing.Insulate The Building Walls With The Atlas Stopter System. Attach The Polystyrene Boards To The Concrete Walls With Plastic Dowels. Paint The Plasters Twice And Prime Them With Polinit Emulsion Paint. Install A Glass Roof Over The Side Entrance To The Dormitory Building. Install Halogen Lamps In The Roof Soffit Along With The Cabling And Connections. Dismantle And Install Smoke Exhaust Flaps. The Requirements Specified By The Ordering Party In These Proceedings Constitute Minimum Requireme
Contact Information
Address
School Complex Of The Agricultural Education Center In Powiercie,Powiercie,62-600,Wielkopolskie,Pl414 - Koniński
Contact No.
632615197
Email
zsoks@wp.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 118700572
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.