The Subject Of The Intention Is To Harden The Area Near Construction Facilities (Buildings) Located In The Radymno Commune In The Towns Of Sośnica, Zaleska Wola, Chotyniec, Presented Below: Task No. 1: Development Of The Area Near The Multi-Functional Building In Sośnica The Order Covers The Execution Of Construction Works In The Following Scope: Aggregates) - Paving Works (Laying Curbs, Edges, Paving Stones On Embankments And Access Points) - Construction Of A New Foundation For The Parking Lot - Hardening Of The Parking Lot Area With Paving Stones - Height Adjustment Of Sanitary Sewage Wells - Tidying Up The Area. The Order Includes Renovation Of Existing Accesses And Sidewalk Strips Along The Buildings And Hardening Of The Parking Lot. Task No. 2: Construction Of A Community Center In Zaleska Wola - Stage Ii (Parking Lot, Terrace, Sidewalks) The Order Includes The Following Construction Works: - Earthworks (Trenching), - Concrete Works, - Aggregate Foundation, - Concrete Paving Stone Surfaces. The Order Includes The Construction Of The Following At The Village Community Center In Zaleska Wola: - A Parking Lot With An Area Of 325 M2 - A Surface Made Of Crushed Aggregate, - A Sidewalk With A Bumper Slab With A Total Area Of 201 M2 - A Surface Made Of Concrete Paving Stones. 6 Cm, Terrace, Platform And Ramp With A Total Area Of 123.00 M2 - Surface Made Of Concrete Paving Stones, Thickness. 6 Cm. Task No. 3: Construction Of A Sidewalk With A Mineral Surface At The Municipal Cemetery In The Town Of Chotyniec The Order Covers The Following Construction Works: Earthworks, Concrete Works, Foundations, Mineral Surfaces (2.8 Mm Granite Aggregate, Granite Edging). Access Road, Fence. The Order Includes The Construction Of A Sidewalk At The Municipal Cemetery In Chotyniec With A Mineral Surface (Hardening The Alleys With Natural Aggregate), 2.8 Mm Gray Granite Aggregate, 3 Mm Thick, 2.00 M Wide, With A Gray Granite Edge On Both Sides, 8 Cm Wide - From The Parking Lot And The Existing Sidewalk Towards The East (Main Avenue). From The North To The South, A Sidewalk With A Mineral Surface Should Be Constructed - Natural Granite Aggregate 2.8 Mm, Gray, 3 Mm Thick, 1.00 M Wide With A Gray Granite Rim On Both Sides, 8 Cm Wide (Three Side Alleys). On The South Side, A Sidewalk With A Mineral Surface Should Be Constructed - Natural Granite Aggregate, 2.8 Mm Gray, 3 Mm Thick, 1.50 M Wide, With A Gray Granite Rim On Both Sides, 8 Cm Wide (Southern Alley And Part Of The Side Alley). The Southern Avenue Connects To The Main Avenue Through Side Alleys. The Entire Sidewalk Construction Is Located In The Used, New Part Of The Cemetery.
|