1. The Subject Of The Order Are Construction Works Consisting In Modernization Of Cloakroom And Sanitary Facilities At Primary School No. 3 And Primary School No. 2 In Myślibórz.2.The Scope Of Investment Includes: A.For The Location At Primary School No. 3 In Myślibórz At Ul. Lipowa 18A, The Task Includes The Modernization Of Cloakrooms And Adjacent Rooms. The Modernization Includes: - Removal Of The Existing Pvc Floor Coverings And Dismantling Of Floor And Wall Coverings; - Removal Of Adhesive Residues, Detached Plasters And Preparation Of The Substrate; - Dismantling Of The Existing Sanitary Fittings; - Demolition Of The Existing Brick Wall And Dismantling Of The Door; - Bricking Up The Opening With Silicate Bricks, Leaving Space For A New Door; - Leveling The Concrete Base And The Surface Of The Walls And Floors;- Priming Floors And Walls;- Making A Leveling Layer Of Self-Leveling Mass; - Installation Of New Floor And Wall Coverings; - Puttying And Painting Of Walls And Ceilings; - Installation Of New Internal Doors; - Removal And Disposal Of Rubble And Waste Generated During The Works.B.For The Location At Primary School No. 2 In Myślibórz At Ul. Józefa Piłsudskiego 18, The Task Includes The Modernization Of Cloakrooms And Rooms Adjacent To Them. The Modernization Includes: - Removal Of Existing Pvc Floor Coverings And Demolition Of Floor And Wall Coverings; - Removal Of Adhesive Residues And Preparation Of The Subfloor; - Leveling Of The Concrete Base And The Surfaces Of Walls And Floors; - Priming Of Floors And Walls; - Making A Leveling Layer Of Self-Leveling Compound; - Construction Of New Floor And Wall Coverings; - Filling And Painting Of Walls And Ceilings; - Dismantling Of Existing Sanitary Fittings And Installation Of New Fittings; - Replacement Of Internal Doors; - Construction Of A New Structure From Plasterboards; - Replacement Of The Cover In The Corner Of The Cloakroom; - Replacement Of The Existing Radiator With A New One With The Same Parameters; - Demolition Of The Existing Furniture And Construction Of A New Structure For Sports Equipment; - Removal And Disposal Of Debris And Waste Generated During The Works.3.The Contractor Is Obliged To Fulfill Information And Promotional Obligations Related To The Fact That The Investment Task Titled Modernization Of Cloakroom And Sanitary Facilities At Primary School No. 3 And Primary School No. 2 In Myślibórz Is Co-Financed By The Fund For The Development Of Physical Culture, Administered By The Minister Of Sport And Tourism.4.As Part Of The Execution Of The Order, The Contractor Is Obliged To Make, Deliver And Install An Information Board At The Site Of Construction Works - In Each Location.5.The Information Board Must Be Constructed And Placed In Accordance With The Guidelines For Fulfilling Information Obligations Applicable To Beneficiaries Of Programs Co-Financed From The State Budget Or State Earmarked Funds, Available At: Https://Www.Gov.Pl/Web/Premier/Dzialania-Informacyjne6.The
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 118698563
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.