|
2. As Part Of The Task, It Is Planned To Perform The Following Construction Works. General Scope Of Works: Demolition Works - Construction: - Demolition Of The Floor Layer Together With The Existing Substructure - Removal Of Loose Internal Plasters, - Successive Excavations Around The Foundation Walls In Order To Under Them. Note: The Method Of Underpinning Is Included In The Technical Construction Design. - Dismantling The Main Roof And The Superstructure, - Demolition Of The Upper Parts Of The Walls In Order To Make A Tie Beam. Reinforced Concrete, - Enlarging The Internal Door Openings, - Making Holes In The External Walls For Ventilation And Air Intakes, Construction Works - Construction: - Making The Soffit Of The Foundation Strips, Note: The Method Of Soffit Is Included In The Technical Construction Design. - Making Of Reinforced Concrete Wreaths, - Making Fragments Of The Demolished Walls, Removed For The Purpose Of Making The Wreaths, - Making Prefabricated Lintels Over The Internal Door Openings, - Making A Full, Horizontal Injection Damp Proofing Of Walls, - Building A Ventilation Stack, - Construction Of New Roofs With Thermal And Water Insulation, - Installation Of New Flooring Layers, - Priming Of All Existing Wall Surfaces (Internal And External), - Internal Plastering, - Painting Of Internal Walls And Ceilings, - Laying Terracotta On The Floor And Tiles At A Height Of 2.0 M Above The Floor (Applies To Toilet Rooms) - Insulation Damp Proofing Of Foundations, - Thermal Insulation Of Foundations, - Thermal Insulation Of External Walls With Thin-Layer Plaster, - Maintenance Of Ceiling Beams In The Superstructure, - Construction Of A Board Floor On The Ceiling Beams Of The Superstructure, - Installation Of Lowered Attic Stairs On Intermediate Beam Ceilings In The Superstructure, - Installation Of Cladding And Gutters, - Construction Of A Stone Band Around The Building, - Execution Hardening Of The Terrain On The Plot, - Construction Of A Complete Fence Around The Building, - Installation Of Ventilation And Air Supply Grilles In The External Walls, - Furniture Equipment: - Cleaning Cabinet (Resistant To Moisture And Household Chemicals), For Brushes, Detergents And Cleaning Products, - Steel Archival Cabinet (Locked) For Documentation, - Desk With An Office Chair, - Steel Shelves. Demolition Works - Installation. Sanitary: - None, Construction Works - Sanitary Installations: - Installation Of Internal Sanitary Sewage System, Under The Floor - In Accordance With The Industry Technical Design, - Installation Of Internal Utility Water Installation - In Accordance With The Industry Technical Design, - Installation Of Hygienic And Sanitary Devices (Ceramic Toilet Bowl On A Frame, Ceramic Washbasin With A Chrome-Plated Tap With A Mixer, Floor Drain, Stainless Steel Dry, Draw-Off Valve Anti-Pollution With A Hose Connector, Instantaneous Domestic Hot Water Heater With A Minimum Power Of 3.0 Kw), - Construction Of Water And Sewage Connections - I
|