Repair Of The Coll De Guixeres Malmes Road Due To The Heavy Rainfalls In January.• Action 1: Construction Of Factory Work And Placement Of Drainage Pipe Intended To Lead The Runoff Water To The Existing Gutter Downstream Thus Avoiding Erosion Of The Road. It Will Also Pave With Concrete The Section Where The Factory Work Is Located And A Water Break Will Be Made In Order To Drain The Water That Circulates Along The Road And Prevent It From Eroding The Lower Part Of The Road. • Action 2: Currently The Runoff Waters Run Along The Road In A Trench And Reach The Intersection Of The Road To Access Ca Noliveres And Damage The Road. The Construction Of Factory Work And The Placement Of A Drainage Pipe Intended To Lead The Runoff Water That Runs Along The Path Of The Plasters And Lead It To The Existing Ditch Located Downstream, Thus Avoiding The Erosion Of The Path. It Will Also Pave With Concrete The Section Where The Factory Work Is Located And A Water Break Will Be Made In Order To Drain The Water That Circulates Along The Road And Prevent It From Eroding The Lower Part Of The Road. • Action 3: Review Work To Punctually Improve Road Sections. These Works Will Consist Of The Review And Leveling Of The Firm And The Contribution Of The All-U Base And The Piquing Of The Material.
Contact Information
Contact Person
Josep Oriol Serra`Madriles
Address
Plaça De Les Escoles S/N
Contact No.
972574626
Email
ajuntament@santmiqueldecampmajor.cat
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 118686325
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.