Electrical Wiring And Fitting Work – Uw Gotha Gleichenstraße - Reko Substation With Construction At 20 Kv Level. The Client (Ag) Of The Project Is Ten Thüringer Energienetze Gmbh & Co. Kg. This Is A Regional Distribution Network Operator. The Planning And Assembly Service Advertised Here Is A Partial Lot As Part Of The Planning And Construction Of A 110 Kv Substation. The New Uw Gotha Gleichenstrasse Will Be Built On The Existing Site Next To The Existing Old Compressed Air Hs System. After The New System Is Put Into Operation, The Old System Will Be Demolished. The New Building Is A Substation With 2 Busbars In One Block. The New System To Be Planned And Constructed Consists Of: - 1 Construction Phase - 2 Busbars - 1 Block - 1 Cross Coupling With Internal Longitudinal Separation (To Be Provided For In The Planning, But Not To Be Built) - 2 Transformer Fields - 1 Ss-U Transformer Field (To Be Provided For In The Planning, But Not To Be Built) - 2 Line Fields - 1 Hs-E Coil Incl. E-Coil Star Point Switchgear - 4 Ms-E Coils Incl. E-Coil Star Point Switchgear (Including Power Dissipation To The Transformers) - 2 Ms Switch Houses (Classification Of The Ms-Sa/Planning And Implementation Of The Transformer Power Dissipation As Well As Cable Corridor Up To The Property Boundary And 20 Kv Cable Couplings Between The Mv Systems) - Execution Planning, Laying And Assembly Of The Entire Secondary Wiring, Including Fiber Optic Cables, In The Uw Site And All Buildings (Price According To Cable Types [Price/100M], Invoicing Based On Measurement), Laying Takes Place Mainly In Empty Conduit Systems - Ac/Dc System Connection Planning Included In The Scope Of Services An - Connection Planning Nea Included In The Scope Of Services An - Fiber Optic Cabling Delivery, Assembly And Measurement (Otdr Measurement; External Fiber Optic Cables Are To Be Spliced, Indoor Fiber Optic Cables Are To Be Laid As Patch Cables) - All Protection And Control Cabinets, As Well As Secondary Planning Are Included In The Scope Of Services An. The Client Provides Sample Circuit Manuals For This Purpose. The Contractor Delivers, Assembles And Connects The Following Cabinets: O 4X Protection And 4X Control Cabinets (Hs) O 1X Ac Main Distribution And 3X Sub-Distribution Cabinets For The Control Cells O 1X Dc Main Distribution (Connect) O 1X Meter Cabinet O 2X E-Coil Switchgear Control Cabinet; 4X Hpci Cabinets; 3X E-Coil Control Cabinets (Hs+Ms) O 2X Transformer Control Cabinet O 2X Ac/2X Dc Sub-Distribution Cabinets O Intermediate Terminal Boxes For Each Transformer And E-Coil O 1X Telecontrol System Consisting Of Two Cabinets The Scope Of The Tender Includes The Planning Of Transferring The Preferred Variant (Lph2) Of A 110 Kv System Handed Over By The Client Into An Implementation Plan And Installing It. Scope Of Planning On The Part Of The Contractor (An): Creation Of Ready-To-Implement Planning Documents For The Construction And Operation Of The 110 Kv Substation Both Analogue In Paper And Digitally In *.Dwg Format Or Suitable Formats. This Includes, Among Other Things: - Sections And Top Views Of Each Field And Transformers And Chokes (Hs And Ms) And Ms Switching House/System (Installation Plan/Cable Layout Plan/Cable Fastening/Assignment Of The Main Bushings). - Ge
Contact Information
Address
Schwerborner Straße 30
Contact No.
+49 0361652-2248
Email
claudia.schellin@teag.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 118681125
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.