|
Construction Work - Design, Construction And Reconstruction Of National Road No. 60 On The Gostynin-Płock Section, Divided Into Two Sections: Section 1. Design, Construction And Reconstruction Of National Road No. 60 On The Gostynin-Płock Section From Km Approx. 52+357 To Km Approx. 55+737 And From Km Approx. 59+011 To Km Approx. 61+900; Episode 2. Design And Construction Of The Łącko Bypass.. The Order Includes In Particular: 1. Design, Based On The Requirements Contained In The Swz, Of A Single Carriageway Road Of Class G On The Section From Gostynin To Płock Along National Road No. 60 From Km Approx. 52+357 To Km Approx. 55+737 And From Km Approx. 59+011 To Km Approx. 61+900 And The Construction Of The Łącko Bypass, Divided Into 2 Sections, 2. Preparation Of Technical Documentation Enabling The Implementation Of Works On The Indicated Sections Of The Road As Above, 3. Obtaining, On Behalf And For The Benefit Of The Ordering Party, All Legally Required Opinions, Arrangements, Permits, Approvals And Decisions Necessary To Design And Implement The Investment, 4. Construction Of The Road As Above. Together With Engineering Facilities And Accompanying Infrastructure. 5. Preparation Of As-Built Documentation Meeting The Requirements Of Relevant Regulations, 6. Obtaining Administrative Decisions For The Use Of The Investment. For The Investment, The Following Construction Works Should Be Designed And Performed, In Particular: 1. Extension Of Dk No. 60 In Km From Approx. 59+011 - Section 2, 3. Construction Of Roads Other Than Roads As Above (Serving Areas Adjacent To The Investment, Restoring Damaged Road Connections, Access To Technical Facilities), 4. Construction Or Reconstruction Of Infrastructure For Pedestrians And Cyclists; 5. Construction Of Area Hardening For Maintenance Purposes; 6. Construction Of Engineering Facilities; 7. Construction Of An Area Drainage System, Including Road Drainage Devices: Road Ditches, Storm Sewage Systems, Pre-Treatment Devices, Retention Reservoirs, Etc.; 8. Construction Of Environmental Protection Devices: Acoustic Protection, Animal Crossings, Ecological Culverts With A Protective And Guiding Fence, Greenery; 9. Construction Of Infrastructure For Facilities On The Expressway Located Along The Road As Above, Including: Power Supply And Lighting Networks, Water Supply Networks, Sanitary Sewage Treatment Networks And Devices, Storm Sewage System With Pre-Treatment Devices, Etc.; 10. Reconstruction Of Conflicting Devices And Networks Of Existing Infrastructure: Telecommunications And Energy Devices, Water Supply Networks, Rainwater And Sanitary Sewage Systems, Gas Networks, Drainage And Hydrological Devices, Railway Devices And Others; 11. Construction Of Road Lighting; 12. Traffic Organization (Horizontal And Vertical Markings With Equipment), Road Safety Devices, Including Traffic Lights, 13. Strengthening The Ground To Obtain Appropriate Conditions For The Foundation Of Roads And Engineering Structures, As Well As The Body Of High Embankments Along With Surface Strengthening Of Slopes; 14. Cleaning And Unblocking Existing Drainage Devices And Receivers To Effectively Drain Water From The Road; 15. Complete Recultivation Of Areas Occupied By Technical And Social Facilities, The Construction Site, Technological Roads And Any Other Transformed Areas
|