|
Tender For Pulli W.No. 3 Moh Changar Pyt. Saloonia-A Block Sathra Under Pri Grant Year 2026-27 1St Call- 1 Earth Work In Excavation By Manual Means In Trenches For Foundations, Drains, Pipes, Cables Etc. (Not Exceeding 1.5 M In Width) And For Shafts, Wells, Cesspits And The Like Not Exceeding 10 Sqm On Plan, Including Dressing Of Sides And Ramming Of Bottoms Lift Upto 1.5 M, Including Getting Out Excavated Earth And Disposal Of Surplus Excavated Earth As Directed::All Kinds Of Soil : 2 Providing And Laying In Position Cement Concrete Of Specified Grade Including Curing But Excluding The Cost Of Centring And Shuttering. All Work Upto Plinth Level With: 1:5:10 (1 Cement : 5 Coarse Sand : 10 Graded Stone Aggregate 40 Mm Nominal Size) 3 Providing And Laying In Position Cement Concrete Of Specified Grade Including Curing But Excluding The Cost Of Centring And Shuttering. All Work Upto Plinth Level With:1:3:6 (1 Cement : 3 Coarse Sand : 6 Graded Stone Aggregate 20 Mm Nominal Size) With 30% Stones 4 Reinforced Cement Concrete Work In Beams, Suspended Floors, Roofs Having Slope Upto 15°, Landings, Balconies, Shelves, Chajjas, Lintels, Bands, Plain Window Sills, Staircases And Spiral Stair Cases Upto Five Level Including Curing But Excluding The Cost Of Centring, Shuttering, Finishing And Reinforcement With 1:1½:3 (1 Cement : 1½ Coarse Sand : 3 Graded Stone Aggregate 20 Mm Nominal Size) 5 Steel Reinforcement For R.C.C. Work Including Straightening, Cutting, Bending, Placing In Position And Binding All Complete Above Plinth Level Mild Steel And Medium Tensile Steel Bars 6 Structural Steel Work In Single Section, Fixed With Or Without Connecting Plate, Including Cutting, Hoisting, Fixing In Position And Applying A Priming Coat Of Approved Steel Primer All Complete. 7 Dry Random Rubble Masonry With Hard Stone In Foundation And Plinth:Without Bond Stone 8 Cement Concrete Flooring 1:2:4 (1Cement: 2 Coarse Sand: 4 Graded Stone Aggregate) Finished With A Floating Coat Of Neat Cement Including Cement Slurry And Curing Complete, But Excluding The Cost Of Nosing Of Steps Etc. Complete.50 Mm Thick With 20Mm Nominal Size Stone Aggregate. 9 Centering And Shuttering Including Strutting, Propping Etc. And Removal Of Form For: Foundations, Footings, Bases Of Columns Etc. For Mass Concrete. 10 Centering And Shuttering Including Strutting, Propping Etc. And Removal Of Form For: Suspended Floors, Roofs, Landings, Balconies And Access Platforms. 11 Centering And Shuttering Including Strutting, Propping Etc. And Removal Of Form For:Edges Of Slabs And Breaks In Floors And Walls Under 20 Cm Wide
|