Canal Locks Construction Work – E21 - New Locks - Trollhätte Canal, Trollhättan. Form Of Contract: Joint Contract (Tem) With Phase 1 According To Abk09 And Phase 2 According To Abt06. Work On The New Trollhättan Lock Route Includes: • The Construction Of Three New Locks Consisting Of A Triangular Lock Upstream And A Lock Staircase Downstream With An Intermediate 150 Long Lock Channel • Extensive Rock Shaft For The Lock Route • Linkage And Concrete Quays • Lock Technology And Lock Gates • Technology Buildings And Channel Center • Widening Of The Existing Rock Channel • Flap Bridge Over The Rock Channel (Västergärdet Bridge) • Openable Bridge Over The New Lock Route • Dredging Of The New Fairway • Temporary Cargo Port • Construction Of Roads, Footpaths And Cycle Paths • Dam Construction Rd Piles With Crown Beam, As Well As Lamellar Dam • Dam Protection Existing Lock Installation, And Adaptation Of The Existing Lock Area. • Remediation Of Contaminated Land On An Existing Industrial Area Approximate Quantities • Rock Shaft Sluice Path: 750,000 M3 • Earth Shaft Sluice Path: 100,000 M3 • Rock Shaft Rock Channel: 80,000 M3 • Concrete: 65,000 M3 • Steel 500 Tons • Linkage And Quays 1,100 M • Dredging Mud: 75,000 M3 • Dredging Rock: 15,000 M3
Contact Information
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 118643326
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.