Architectural, Construction, Engineering And Inspection Services – Objektplanung Gem. Par.34 Hoai, Lph 1-9. Property Planning Services In Accordance With Section 34 Hoai Service Phases 1-9, For The New Construction Of A Fire Stations Resources Storage Facility And Official Apartments. Planning A Temporary Use Of The Area As Interim Quarters For The Training Operations Of The Fire Department And Rescue Service School. The Location Is A Vacant City-Owned Property In Munich Aubing, In The Area Of The Langenburgstrasse, Kronwinklerstrasse And Kastelburgstrasse Commercial Areas. The Aubing Fire Stations Resource Warehouse Is Planned With A Storage Hall For Roll-Off Containers, A Storage Area For High-Bay Warehouses, Workshops And The Associated Administration. Service Apartments Will Be Accommodated On The Floors Above The Two-Story Storage Hall. The Apartments Will Be Offered In The Form Of 2 To 4 Room Apartments And Will Have Their Own Address. The Fw Aubing Guard Building With Vehicle Hall, Guard Operations And Rest Rooms Will Only Be Planned And Implemented At A Later Date And Is Not Part Of The Planning. However, The Planning Must Take The Guard Building Into Account, Especially With Regard To Access. The Building Block Along Kastelburgstrasse Is To Be Used As An Interim Use For Parts Of The Fire And Rescue Service School (Frsm) From Aidenbachstrasse. The Future Storage Halls For Roll-Off Containers, Workshops And Social Areas Planned In The Component On The Ground Floor Are To Be Used For The Frsm As Vehicle Parking Lanes And Training Halls. The Hall Of The Pallet Rack Warehouse For Operational Resources Can Serve As A Training Hall For The Frsm. Exterior Surfaces Are Paved In Advance As Practice Areas. The Effort For The Changes And Conversions For The Final Use As A Resource Storage Facility Must Be Coordinated And Minimized At An Early Stage In The Planning. The Approved, Preliminary User Requirements Program Is Included With The Attachments. The Requirements For Standard And Equipment And Open Spaces Can Also Be Found In The Preliminary User Requirements Program. The Preliminary Space Requirements For Both The Resource Storage And The Interim Areas Are Shown In The Space Program Appendix. The Fire Departments Feasibility Study And Area Considerations For Interim Use Are Included As An Appendix To The Procedure. The Operational, Economic And Sustainable Feasibility Of A Coherent Overall Concept, Taking Into Account Interim And Final Use, Are Essential Requirements. There Is No Development Plan, Building Law Assessment According To Section 30 Paragraph Of The Baugb In Conjunction With Section 34 Paragraph 1 Of The Baugb. The Preliminary Decision For 2023 Was Approved. Requirements For Open Spaces For Outdoor Areas, Car Parking Spaces And The Exercise Yard Are Particularly Important. An Underground Car Park Should Be Avoided If Possible. The Number Of Parking Spaces Specified In The Space Program Represents The Maximum Number. In The Preliminary Planning, The Parking Spaces Are Determined Based On The Usable Areas
Contact Information
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 118630471
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.