|
Bids Are invited for Annual Maintenance Service-Air Conditioner - Annual Comprehensive Maintenance And Repair Of The Following Rating Window Acs, Split Acs, Cassette Type Acs, Including Attending Preventive & Breakdown Maintenance, Providing Necessary Spares, Consumables, Etc., Providing Reparing/Replacement Of Defective Compressor By Same Company Compressor & Replacement Of Other Defective Components Like Relay & Switches, Motor, Capacitor Etc. With Original Components I/C Repair & Maintenance Of Stabiliser Etc. Complete As Required , Annual Comprehensive Maintenance And Repair Of The Following Rating Inverter Split Acs, Including Attending Preventive & Breakdown Maintenance, Providing Necessary Spares, Consumables, Etc., Providing Reparing/Replacement Of Defective Compressor By Same Company Compressor & Replacement Of Other Defective Components Like Relay & Switches, Motor, Capacitor Etc. With Original Components I/C Repair & Maintenance Of Stabiliser Etc. Complete As Required , Annual Comprehensive Maintenance And Repair Of The Following Rating Water Cooler, ( 40/80 Ltrs & 60/120 Ltrs ) Including Attending Preventive Maintenance Activity & Breakdown Maintenance, Providing Repairing/ Replacement Of Defective Compressor By Same Company Compressor & Replacement Of Other Defective Components With Original Components I/C Repair & Maintenance Of Voltage Stabilizer Etc. Complete As Required Etc. , Annual Comprehensive Maintenance And Repair Of The Reverse Osmosis(Ro) System Of Acqua Fresh Make Having Capacity 50 Lph I/C Supply & Replacement Of All Spares & Part Pump & Membranes Complete As Required , Annual Comprehensive Maintenance Contract Of Reverse Osmosis System Model-Zero B Commercial 25 Lph I/C Supply & Replacement Of All Spares & Part Pump & Membranes Complete As Required , Deployment Of 1 No. Ac Technician (Skilled) (Epf, Esi & Bonus On Reimbursement Basis ) For Day-To-Day Repair/Maintenance Of The Split Acs, Cassette Type Acs, Water Cooler, Ro Water Purifier, Etc. & All Equipment Under This Contract, Including Attending Preventive & Breakdown Maintenance In General Shift On All Days But Excluding Weekly Off And National Holidays As Required. , Supply And Laying Of Copper Refrigerant Piping With Insulation (Nitrile Rubber With Silver Foil), Comprising Suction And Discharge Pipes, For Air-Conditioning Units Of 1.5 Tr/2.0 Tr Capacity, Including Provision Of Suitably Sized Interconnecting Cables Between The Indoor And Outdoor Units, Complete In All Respects As Required. , Supply And Laying Of Pvc Piping (25 Mm) Etc. As Required For Ac Drain Piping Complete As Required. , Installation , Testing And Commissioning Of Capacity 1.5/2.0 Tr All Type Make High Wall Split/Cassette Air Conditioner Unit Including Fixing Of Existing Refrigerant Pipe With Insulation & Suitable Flexible Copper Conductor Cable Between Evaporator And Condenser Units And Topping Up Suitable Refrigerant Gas Etc Complete As Required .
|