The Subject Of The Order Is The Modernization By Renovation Of Municipal Road No. 320140W Located In Zaręby, Chorzele Commune. The Subject Task Will Consist In Modernization By Renovation Of Municipal Road No. 320140W Located In Zaręby, Chorzele Commune At Km 0+000.00 To Km 3+071.55. Modernization Through Renovation Of The Municipal Road Will Consist In Filling In Defects And Cracks In The Road Surface (Leveling Layer) And In Installing An Asphalt Overlay In Place Of The Used Asphalt Layer, While Maintaining The Current Width Of The Road (Width Of The Asphalt Surface Variable 4.50 M - 6.00 M), As Well As In Cutting Down The High Shoulders And Filling In The Low Shoulders With Aggregate. Łamany. Scope Of Work At The Stage Of Project Implementation: - Measurement And Preparatory Works; - Filling Of Defects And Cracks In The Existing Road Surface; - Renovation Of The Road Surface (Width Of Asphalt Surface Variable 4.50 M - 6.00 M) - Wearing Course Of Ac 11 S 50/70 Thick. 5 Cm - Renovation - Cutting Down The Low Sides And Filling The High Sides With Crushed Aggregate. 5 Cm - Making Vertical Markings, The Task Also Includes Incuring Costs Resulting, Among Others, From: - Geodetic Services (Measurement Works - Preparation Of Post-Construction Inventory); - Restoring The Adjacent Area To The Condition As Before The Commencement Of The Works; - Carrying Out Soil Compaction Tests And Other Tests Necessary For The Proper Performance Of The Works; - Securing The Existing Telecommunications And Water Supply Networks; - Vertical Adjustment Of Wells For Water Supply Valves - If Applicable; - Removal Of Collisions With External Devices And With Uninvented Above-Ground And Underground Infrastructure; - Removal Of Trees And Shrubs That Interfere With The Planned Investment; - Costs Of Excavation And Removal And Disposal Of Excavated Material; - Own Management And Storage Of Excess Soil; - Performance Of Leakage Tests; - Securing The Construction Site (Excavations) For The Duration Of The Works. Other Information: - In The Area Covered By The Study, The Following Utilities Are Located: Water Supply Network, Overhead And Cable Power Grid, Telecommunications Network. - Works Located At The Intersection With Underground Utilities Should Be Performed Manually After Prior Notification Of The Works To The Utility Owners. - The Fittings Of The Underground Technical Infrastructure Devices Should Be Adjusted To The Designed Ordinates. - Technological Works Should Be Adapted To Conditions Of The Surrounding Area. Security Of Existing Telecommunication Cables Before Starting Work Close To The Telecommunications Infrastructure, The Commencement Of Work Should Be Notified In Order To Establish Supervision By The Technical Services Of Orange Polska S.A. After Completing The Construction And Assembly Works, The Contractor Is Obliged To Prepare As-Built Documentation.2. Certificate Of Public Procurement Contractor1) The Contractor May, Instead Of Appropriate Subjective Means Of E
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 118548835
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.