|
Bids Are invited for Industry Unit; Constructing A Pump Base Installing The Pump And Motor Up To 20 Hp And Conducting A Trial Run; Buyer , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Industry Unit; Dismantling Fabricating And Erecting Weak Or Corroded Pipelines Up To 12 Inch And Conducting A Satisfactory Leak Proof Trial Run; Buyer , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Industry Unit; Dismantling Fabricating And Erecting Weak Or Corroded Bends Up To 12 Inch And Conducting A Satisfactory Leak Proof Trial Run; Buyer , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Industry Unit; Dismantling Fabricating And Erecting Weak Or Corroded Flanges Up To 12 Inch And Conducting A Satisfactory Leak Proof Trial Run; Buyer , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Industry Unit; Remove The Worn Out Runners From The Main Bagasse Carrier Bagasse Elevator And Return Bagasse Carrier Install 8X65 10X50 Mm Flat Iron In Their Place G.. , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Industry Unit; Cut And Remove The Worn Out Side Plates Of The Main Bagasse Carrier Bagasse Elevator And Return Bagasse Carrier Install 6 8 10 Mm Plates In Their Place.. , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Industry Unit; Dismantling Fabricating And Erecting Weak Or Corroded Pipelines Up To 12 Inches And Conducting A Satisfactory Leak Proof Trial Run; Buyer , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Industry Unit; Dismantling Fabricating And Erecting Weak Or Corroded Bends Up To 12 Inches And Conducting A Satisfactory Leak Proof Trial Run; Buyer , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Industry Unit; Dismantling Fabricating And Erecting Weak Or Corroded Flanges Up To 12 Inches And Conducting A Satisfactory Leak Proof Trial Run; Buyer , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Industry Unit; Remove The Old And Corroded Quad Condensate Juice Heater Condensate Syrup Vessel Fabricate A New One Using 8 10 Mm M S Plate Complete All Connections .. , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Industry Unit; Repair Apply Patches And Strengthen The Umbrella Assembly Within The Vapor Shell Juice Heater Quad Body And Ensure A Satisfactory Trial Run; Buyer , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Industry Unit; Remove The Corroded Filtrate Vessel Of The Vacuum Filter Fabricate And Install A New Filtrate Vessel Using 8 10 Mm M S Plate Complete All Connections .. , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Industry Unit; Removal Of The Old Corroded Platform And Installation Of A New Platform In Its Place; Buyer , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Industry Unit; Dismantling The Corroded Or Weak Shell Compartment Of The Door Clarifier Fabricating A New One Using 6 8 Mm Plates Installing It On Site Welding It An.. , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Industry Unit; Dismantling Fabricating And Erecting Weak Or Corroded Reducers 600 800 Mm At The Quad Station Followed By A Satisfactory Leak Proof Trial; Buyer , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Industry Unit; 2
|