Construction Work – Construction Of A Special Educational Center In Sanok – Stage Ii. 1. The Subject Of The Order Is The Implementation Of The Task Entitled: Construction Of A Special Educational Center In Sanok - Stage Ii. The General Scope Of The Investment: • The Investment Of The Second Stage Includes Comprehensive Internal And External Finishing Works, Installation Works Of All Industries In The Field Of Internal And External Installations, Installation Of Joinery, Landscaping In Accordance With The Design, Installation Of A Photovoltaic Installation, Construction Of A Collector To Discharge Rainwater Into The San River, Construction Of An Underground Fire Protection Tank. • Delivery And Installation Of Equipment For Land Development Elements, Sports Fields, Recreation Areas, Parking Lots, School Surrounding Lighting, Fencing External • Delivery And Possible Installation Of Rehabilitation Equipment, Office And Teaching Studio Equipment, Gym Equipment, Dormitory And Canteen Equipment. The Scope And Details Of Deliveries Must Be Fully Agreed With The Ordering Party. • Installation Of A Photovoltaic Installation On The Roof Of The Building. • Construction Of A Container Transformer Station Under The Conditions Specified By The Electricity Supplier. Currently, After The First Stage Of The Investment, The Facility Is In The Open Shell Phase. Flat Roofs Covered With Prestressed Hollow-Core Slabs Were Secured With A Single Layer Of Thermally Weldable Felt And Equipped With Temporary Overflow Drains. The Insulation Layer And The So-Called Layer Were Not Laid. Inheritance. The Roof Of The Sports Hall Is Covered With Trapezoidal Sheet Metal At This Stage. The Floors In All Parts Of The Building Were Covered With A Layer Of Lean Concrete. Sections Of Sanitary Sewage Systems Were Constructed Under The Floors In Accordance With The Design Documentation, Leading Them Outside The Buildings Outline. As Part Of The Works Of The First Stage Of The Investment, The Collision Of A 15 Kv Medium Voltage Cable, Included In The Design Documentation, Was Removed. The Conditions For Making A Water Supply Connection Will Change. After The District Infrastructure Authority In Lublin Made A Water Connection To The Military Facilities In The Vicinity Of The Sosw, It Was Possible To Connect To The Water Supply Running Through The District Plot. The Contractor Is Obliged To Submit A Detailed Interior Design Design, Which Should Be Submitted To The Ordering Party For Approval. 2. The Subject Of The Order Must Be Completed, In Particular, In Accordance With The Technical Documentation (Annex No. 2 To The Swz). The Material Scope Of The Task Being The Subject Of The Tender Is Described In Detail In The Technical Documentation, Technical Specification For The Execution And Acceptance Of Works, And The Bill Of Quantities. Possible Catalog Items Are Provided Only To Facilitate The Calculation - Their Use In The Valuation Is Not Obligatory. The Technical Specification, Bill Of Quantities And Documentation Constitute An Annex To This Specification. The Quality Requirements Of The Elements Constituting The Subject Of The Order Are Described In The Technical Documentation, In Particular In The Technical Specification For The Execution And Acceptance Of The Works. Due To The Fact That The Contractors Remuneration Is Indicated
Contact Information
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 118478160
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.