|
1. The Subject Of The Order Is The Execution Of A Contract In The Design And Build Formula For The Implementation Of A Task Called Modernization Of Water Reservoirs In Order To Restore Their Retention Along With The Development Of Adjacent Spaces In The Bejsce Commune, I.E. In The Following Months: Królewice, Uściszowice And Kijany. The Scope Of The Order Includes: Design Works (A). The Subject Of The Order Is The Development Of Design Documentation In The Field Of Development Of A Construction Design Together With Obtaining The Necessary Arrangements And Decisions Enabling The Construction Process And, Based On Them, The Execution Of Construction Works For The Task In Accordance With Applicable Regulations. Legal Provisions. The Design Documentation Is To Be Complete In Order To Obtain The Necessary Decisions That Will Enable The Commencement Of Construction Works As Part Of The Investment In Question. The Ordering Party Will Provide The Contractor With All Necessary Powers Of Attorney To Obtain, In Particular, A Building Permit/Notification. Scope Of Construction Works (B). The Contractor Will Perform The Works In Accordance With The Study, Design And Executive Documentation Approved By The Engineer And The Ordering Party. The Construction Works Include: Preparatory Works: Development Of The Construction Site, Including: - Construction Facilities, - Supply Of Utilities Necessary For The Construction Purposes, - Temporary Fences, - Access Roads To Facilities, - Fire Protection Devices And Occupational Health And Safety, - Full Surveying Services At The Stage Of Design, Execution Of Works And Post-Construction Inventory With Contribution To The State Geodetic Resource, - Removal Of Existing Trees, Grubbing Up Trees And Shrubs And Remaining Greenery (Use Of The Harvested Wood Should Be Agreed With The Investor) Earthworks: - Perform Earthworks Mechanically And Manually, - Removal Of The Topsoil Layer, - Demolition Works, Demolition Pond Embankments, Demolition Of Road Slabs, - Earthworks (Embankments, Excavations), - Transport Of Soil Onto Embankments, Incorporation Of Soil Into The Embankments, - Compaction Of Embankments To The Extent Consistent With The Documentation, - Topsoil Covering: Embankment Slopes, Excavation Slopes, Area In The Road, Technological Works: - Desilting The Pond To The Average Depth Indicated In The Pzt Along With Transporting The Excavated Material To A Distance Of Up To 1 Km, The Employer Allows The Use Of The Excavated Material In The Investment Area After Checking Its Suitability For The Above-Mentioned Purposes, - Construction Of Strengthening The Banks Of The Pond (Stone Riprap) - Construction Of Strengthening The Internal Banks (Slopes) Of The Pond With A Slope Of 1:1.5-2 Along With Sowing With A Grass Mixture, - Construction Of New Monks And Discharge Devices, Penstocks, Tributaries, Diameters And Parameters To Be Selected Based On Calculations, - Desilting Of The Ditch, Technical Parameters Selected Based On Calcu
|