|
Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - As Per Scope Of Work; As Per Scope Of Work; As Per Scope Of Work - Opening Of The Manhole Cover For Cleaning Of Tower Section / Distributor Cleaning And Sparger Installation Manhole Installation With The Gasket/ Normalization During Ugp Shutdown. , Ugp Viewing Window O-Ring Replacement During Ugp Shutdown. , Flange Gasket Replacement (Flange Size -Upto 3) , Flange Joint Gasket Replacement (Flange Size- 3 To 8) , Flange Joint Gasket Replacement (Flange Size- 10 And Above) , Overhauling Of Diaphragm Valve (Size Up To 2) , Overhauling Of Diaphragm Valve (Size > 2.5) , Overhauling Of Gate/Globe/Check Valve (Size: Upto 4) , Overhauling Of Gate/Globe/Check Valve (Size: 6 To 10) , Overhauling Of Gate/Globe/Check Valve (Size: 10 And Above) , Relief Valve Calibration (Size: Upto 3 Inlet Size) , Relief Valve Calibration (Size: Greater Than 3 Inlet Size) , Overhauling Of Centrifugal/Vacuum Pump/Canned Rotor Pump (Size < 10 Kw Power Rating) , Overhauling Of Centrifugal Pump/Electric Motor Capacity > 10 Kw Power Rating And < 50 Kw . , Overhauling Of Centrifugal Pump/Electric Motor Capacity > 50 Kw Power Rating And < 150 Kw. , Overhauling Of Washing Machine/ Drying Tumblar/ Hydro Extractor Machines At Wmp Laundrry/ Non Active Aundry. , Shell And Tube Type Hx Cleaning; (Includes Flanges Opening, Tube Cleaning And Box-Up);Size <20 , Shell And Tube Type Hx Cleaning; (Includes Flanges Opening, Tube Cleaning And Box-Up);Size >20 , Cleaning Of Filter/Strainer (Size Upto 6). , Cleaning Of Filter/Strainer (Size More Than 6). , Overhauling Of Ahu. , Replacement Of Ahu. , Replacement Of Pulley Of Fan/Ahu. , Replacement Of V-Belt (One Set) Of Fan/Ahu. , Replacement Of Vibration Isolator Pad Of Ahu/ Fan. , Drain Tray Cleaning And Drain Line Flushing Of Ahu. , Insitu Cleaning Of Fins Of Ahu Cooling Coil. , Cooling Coil Replacement Of Ahu. , Overhauling Of Centrifugal Fans (Up To 30 Kw Motor Rating). , Overhauling Of Centrifugal Fans (Above 30 Kw Motor Rating). , Duct Mounted Fan Removal And Installation. , Fan / Motor Bearing Greasing. , Replacement Or Cleaning Of Pre Filter/Wire-Mesh/Grill. , Replacement Of Hepa Filter. , Replacement Of Hepa Charcoal Filter. , Installation Of Screen/ Wire Mesh. , Overhauling/Maintenance Of Multi Flapper D Er/Gravity Louvers , Fabrication & Installation Of Multi Flapper D Er/Gravity Louvers. , Fussible Link Inspection Of Fire D Ers. , Fabrication And Installation Of New Duct. , Removal And Installation Of Old Ducts. , Fabrication And Installation Of Miscellaneous Gi Sheet Items. , Canvas Cloth Installation In Ducts Expansion Joints (Up To 1600 Mm Perimeter). , Canvas Cloth Installation In Ducts Expansion Joints (Above 1600 Mm Perimeter). , Turbine Building / Service Building Air Washer Plant Spray Nozzles Removal, Cleaning, Replacement, Installation And Testing. Including Flushing Of All Headers Of Air Washer Plant. , Replacement Of Tyre In Tyre Coupling Of Ahu. , Insitu Cleaning Of Pc Cooling Coil Fins. , Insitu Cleaning Of Fm Vault Cooling Coil Fins. , Insitu Testing Of Butterfly D Er. , Overhauling Of Butterfly Valve/D Er (Up To Size 300 Mm Dia.). , Overhauling Of Butterfly Valve/D Er (Above Size 300 Mm Dia.). , Actuator Seal Kit Replacement. , Molecular Sieve Replacement. , Replacement Of Door Seals. , Maintenance Of Door Lever (Handle). , Closing/Opening Of R/B V1/V2 Door. , Replacement Of Polythene Sheets Of Suppression Pool And Vent Shaft Opening In R/B. , Ep Opening And Boxup. , Fm Vault Liner Cooler Casing Removal And Installation. , Fm Vault Fan Casing And Support Fastener Tightening. , Providing Assistance To Departmental Manpower For Various Condition Monitoring Checks, Routine Work/ Miscellaneous Jobs By One Semi-Skilled Person For 8 Hrs. , Hourly Assistance Beyond Normal Working Hours For Manpower Against Soqr- 61. , Providing Assistance To Departmental Manpower For Various Condition Monitoring Checks, Routine Work/ Miscellaneous Jobs By One Skilled Person For 8 Hrs. , Hourly Assistance Beyond Normal Working Hours For Manpower Against Soqr- 63. , Providing Assistance To Departmental Staff For Various Office Works, Related To Documentation And Vibration Trending Of Ventilation Group Equipment By One Skilled Person For 8 Hrs. , Supply Of Industrial Grade Heavy Duty Pen Oil. , Supply Of Chisel Paint Stripper (Gasket Remover). , Supply Of Rubber Sheet As Per Attached Specifications, Moc-Buna-N (Nbr), Size= 2000 Mm X 1000 Mm X 1.6 Mm , Supply Of Rubber Sheet As Per Attached Specifications, Moc-Buna-N (Nbr), Size= 2000 Mm X 1000 Mm X 3.0 Mm , Supply Of Special Proofed Cotton Canvas As Per Bis Specification No. Is:6803 : 1972 With Basic Fabric As Per Bis Specification No. Is: 1424-1983, Latest, Variety-3; Width 91Cm
|