Computer-Related Services – Server Hosting Service. Insurance For 18 Months. The Task Of The Winning Bidder Is To Provide Server Hosting Services To The Bidder For A Period Of 18 Months Up To A Net Frame Amount Of Huf 100,128,000, Of Which The Bidder Undertakes To Draw Down 100 Percent Of This Amount. Placement Of The Clients Servers To A High Technical Standard, And The Provision Of Related Technical And Professional Services. Ensuring Undisturbed Operating Conditions, A High-Quality Technical Environment And A Continuous High-Bandwidth Connection For Servers And Telecommunications Equipment, In Addition To The Continuous Maintenance Of Services. Requirement Regarding Data Center The Bidders Expectation Regarding The Data Center Is That It Has At Least A Tier Iii Or Equivalent Certified* Machine Room. Power Supply Of The Area (Hosting) Each Rack Cabinet Must Be Provided With At Least 2 Independent Power Supply Iec320 Electrical Distribution Strips And Mains Connectors. Statics Providing A Slab/False Floor That Can Withstand The Total Weight Of A Standard (19 42U High (1970X600x1200) Rack Cabinet With A Full Load (Approx. 1360 Kg). Fire Protection, Ventilation, Power Supply, Utilities. Fire Protection. Fire Protection Required For Electrical Rooms. Sensors And Automatic Fire Extinguishing System With Gas. Operational Environment. Server Room Temperature In Accordance With The Manufacturers Specifications. Providing A Redundant Air Conditioning System That Maintains A Maximum Of 22 ± 2°C, Which Provides Cooling From Under The False Floor, Through The Rack Cabinets. The Maximum Humidity Can Be 50% (According To Msz En 300 019-1-3:2003 Class 3.1: Controlled Temperature Accommodation) Providing Fresh, Filtered, Dust-Free Air. Ensure That The Ceiling, Floor And Walls Of The Machine Room Are Free Of Water And Gas Lines. Lighting In The Case Of Offices, Electrical (Power) And Data Communication (Low Current) Cabling Is Done Through The False Floor. Use Of A Cable Management System. And Disconnections. Power Supply That Can Be Individually Interrupted Per Cabinet (Small Breaker Or Individual Switch). Calculation Of The Fee: Electricity Consumption Fee = Measured Consumption * Electricity Fee Corrected By Cooling Factor A.) Measured Consumption: Monthly Consumption Measured On The Basis Of An Individual Consumption Meter B.) Corrected By Cooling Factor (Pue - The Ratio Of The Total Power Consumption Of The Data Center And The Power Consumption Of The It Devices) Electricity Fee Uninterruptible Power Supply Uninterruptible Power Supply System (With Aggregator And Interruption
Contact Information
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 118323607
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.