Bgis On Behalf Of Alberta Infrastructureexisting Elevator Is To Be Modernized With New Elevator Machine Room. The Intent Of The Project Is To Fully Modernize The Existing Glass Elevator To The New 2019 Elevator Code. The Electrical Contractor Will Replace All Conduit Systems, Power, Lighting, And Fire Alarm That Pass Through The Ceiling Space At The Top Of The Elevator Shaft, Five Feet Outside The Elevator Shaft, And Were Affected By The Fire. Install New Led Strip Lighting Above Elevator Thresholds On All Floors And Connect It To Existing Elevator Lobby Lighting Controls To Meet Aedarsa Illumination Level Requirements. Reprogram The Existing Elevator Lobby Smoke Detectors And Control Relays For Homing And Alternate Homing Of The New Elevator Controller. Provide And Install New Cat6a, Ft6 Data Cable To The New Elevator Machine Room From The Existing Wiring Closet In The Building.
Contact Information
Contact Person
Luc Hounjet
Address
Third Floor, 6950-113 StreetEdmonton, AlbertaT6H 5V7Canada
Email
Luc.Hounjet@bgis.com
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 118256280
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.