Bridge-Design Services – 2026-62_K164_Enb_Op_Ing_Twp. The Following Services Must Be Provided In Accordance With Hva F-Stb, 2022-03, Section 1.5: - Object Planning For Engineering Structures (Hoai Part 3, Section 3) - Specialist Planning For Structural Engineering (Hoai Part 4, Section 1) - Dismantling Planning In The Object Planning Of Civil Engineering Structures - Dismantling Planning In The Specialist Planning Of Structural Engineering Structures - Shoring Planning In The Object Planning Of Civil Engineering Structures - Structural Planning In The Specialist Planning Of Structural Engineering Structures - Special Services Of Object Planning Engineering Structures - Special Services Of Specialist Planning Structural Planning The Contractor Must Provide The Following Services. The Exact Services To Be Provided Can Be Found In The Respective Service Descriptions. 2.1.1 Part I - Replacement New Construction, Object Planning Of Engineering Structures (Appendix 1.1) Service Phase 1: Basic Determination Service Phase 2: Preliminary Planning Service Phase 3: Design Planning Service Phase 6: Preparation For The Award Of Contract, Specialist Planning, Structural Planning (Appendix 1.2) Service Phase 2: Preliminary Planning Service Phase 3: Draft Planning Service Phase 6: Preparation For The Award Of Contract 2.1.2 Part Ii - Dismantling Of The Object Planning Of Engineering Structures (Appendix 1.3) Service Phase 1: Basic Determination Service Phase 2: Preliminary Planning Service Phase 3: Draft Planning Service Phase 6: Preparation For The Award Of The Contract, Specialist Planning, Structural Planning (Appendix 1.4) Service Phase 1: Basic Determination Service Phase 2: Preliminary Planning Service Phase 3: Draft Planning Service Phase 6: Preparation Of The Award 2.1.3 Part Iii - Built Object Planning For Engineering Structures (Appendix 1.5) Service Phase 1: Basic Determination Service Phase 2: Preliminary Planning Service Phase 3: Design Planning, Service Phase 6: Preparation Of The Award, Specialist Planning, Structural Planning (Appendix 1.6) Service Phase 3: Design Planning, Service Phase 6: Preparation Of The Award As Part Of The Planning, The Following Boundary Conditions And Compulsory Points Must Be Taken Into Account: The Bridge Carries The District Road K164 Over The Große Hase Water Body. When Planning, The Concerns Of Water Drainage, Particularly With Regard To Flood Events, Must Be Taken Into Account. Depending On The Results Of The Hydraulic Investigation, A Construction Time Restriction On The Flood Drainage Cross-Section May Need To Be Avoided. Construction Period Conditions, Construction Methods And The Dismantling Of The Existing Structure Must Be Taken Into Account At An Early Stage. Interventions In The Water, The Bank Areas And Adjacent Areas Must Be Limited To The Necessary Minimum. During Planning, The Necessary Coordination Must Be Carried Out With Affected Third Parties, In Particular The Cloppenburg District, The Responsible Water And Soil Association And Affected Management Bodies. The Circular Economy Act (Krwg) Must Be Observed For The Waste And Disposal Concept. The Resulting Substances Must Be Classified In Accordance With The Waste Catalog Ordinance (Avv). In Addition, The Relevant Technical Rules For Hazardous Substances (Trgs) Must Be Taken Into Account
Contact Information
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 118186138
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.