|
The Subject Of The Order Is The Modernization Of Some Rooms Of The Primary School In Czyżew - Renovation Of The Sports Hall And Gym Along With Equipment And Sanitary And Cloakroom Facilities. The Investment Is Located On Plots No. 582/8, Located Within 0002 Czyżew, In The Registration Unit 101303_4 Czyżew. The Renovation Works Include Partial Replacement Of The Electrical Installation With Lighting Lamps, Replacement Of Sanitary Equipment In Cloakroom And Sanitary Complexes, Modernization Of Wall Cladding, Floors And Ceilings, And Locker Room Equipment. Renovation Of The Sports Hall Located On The First Floor Includes, Among Others: Demolition Works - Wiping Of Internal Plasters And Scraping Off Paint On The Walls, Construction Of A Suspended Coffered Ceiling With Filling With Ceiling Tiles, Walls - Plastering, Painting Works, Wall Coverings, Priming Substrates, Painting Smooth Plasters, Floors - Mechanical Grinding Of Parquet Floors, Polishing, Electrical Works - Installing Lighting And Signaling Systems, Repair Of Electrical Installations Including Replacement Of New Equipment With Replacement Of Lamps With Led Ones, Installation Of Bicycle Racks In The Shape Of The Letter U. Renovation Of The Gym With Equipment And Facilities Sanitary And Cloakroom Facilities Located On The Ground Floor Of The Building Include: Demolition Works - Wiping Of Internal Plasters And Scraping Off Paint On Walls, Walls - Plastering And Painting Walls, Wall Coverings, Priming Substrates, Painting Smooth Plasters, Delivery And Installation Of Gym Equipment - Rowing Machine With Magnetic Resistance, Stationary Cycling Bike, Set Of Dumbbells With A Stand, Racks, Bars, Rubber Olympic Plates, Rubber Floor, Multifunctional Device, Fitness Mats, Gymnastic Balls, Adjustable Benches, Kettlebells, Crates, Punching Bags, Pull-Up Bar, Medicine Ball, Yoga Cube, Set Of Exercise Bands, Locker Rooms And Sanitary Facilities - Repair Of Electrical Installations Including Replacement Of New Equipment With Replacement Of Lamps With Led Ones, Plastering Of Walls And Ceilings, Wall Facing, Priming Substrates, Making Suspended Ceilings, Painting Walls And Ceilings, Wall Coverings, Laying Tiles, Replacing Doors, White Assembly (Including Washbasins, Shower Trays, Toilets, Mounting Elements), Replacing Accessories - Soap Dispenser, Container, Paper Towel, Toilet Paper, Mirrors, Baskets, Delivery And Assembly Of Cloakroom Furniture For Cloakrooms. Note: In The Work Schedule And Organization Of The Construction Site, The Contractor Must Take Into Account The Fact That There Is A Need To Use The Existing Building In Accordance With Its Intended Purpose. Construction Works Will Be Performed In An Active Facility. The Contractor Should Plan The Most Burdensome And Dangerous Works In Consultation With The Facilitys Management. Construction Works Should Be Carried Out Ensuring Continuous Access (Access And Access). The Contractor Is Obliged To Secure And Fence The Construction Site So As Not To Dist
|