1. Subject Of The Order Entitled Improving Access To Small Social Infrastructure In The Town Of Niemienice Kolonia Includes The Creation Of A Publicly Accessible Recreational Zone By Installing Playground Equipment, An Outdoor Gym, Hardening The Area With Aggregate, Making A Safe Surface And Building A Fence.2. The Subject Of The Order Includes The Following: Elements Of Construction Works Such As: 2.1 Gravel Surface.2.2 Safe Surface.2.3 Panel Fence.2.4 Equipment - General Zone.2.5 Equipment - Senior Zone - Outdoor Gym.2.5 Equipment - Toddler Zone - Playground. 3. Characteristic Parameters Of The Subject Of The Order: 3.1 Playground - Toddler Zone - 5 Devices: A) Rocker / Spring Device - 2 Pcs. B) Sandbox 2 × 2 M - 1 Pc., C) Castle Play Set - 1 Pc.) Swing For Younger Children - 1 Pc. 3.2 Outdoor Gym - Senior Zone - 5 Sets/Devices) Elliptical Trainer + Runner 1 Set. B) Seated Press + Overhead Pulley - 1 Set. C) Chest Butterfly - 1 Pc. D) Ladder For Leg Pull-Ups - 1 Pc. E) Rowing Machine + Foot Press - 1 Set.3.3 Safe Surface - Hypertrophic Mats Above. 175 M² Acc. To Pzt/Project Description.3.4 Hardened Aggregate Surface Above 237 M², According To The Pzt/Project Description.3.5 2D Panel Fence - 167 M, According To The Pzt/Project Description.Note: The Subject Of The Order Does Not Include Assembly And Execution Of The Following. Elements Of The Infrastructure Covered By The Subject Of The Order And Shown In The Land Development Design: - Fireplace With A Wall (Design Element No. 18), - Gazebo (Design Element No. 19), - Junior Zone - Older Children, I.E.: Carousel (Design Element No. No. 8), Double Swing For Older Children (Design Element No. 9), Zip Line (Design Element No. 10), Slides (Design Element No. 11), Fitness Set - Spatial Clip Structure (Design Element No. 12), - Toddler Zone, I.E. Rocker / Spring Device - 1 Pc.4.A Detailed Description Of The Subject Of The Order And The Conditions Of Implementation Of The Agreement And Its Scope Are Described In:4.1.Design Documentation, Constituting Annex No. 7 To Swz, 4.2.Stwior – Annex No. 8 To Swz.5.Bill Of Quantities - Annex No. 9 To Swz - Supporting Document. Due To The Fact That The Contractors Remuneration Indicated In The Offer Will Be A Lump Sum, When Pricing The Offer, The Contractor Should Rely On The Scope Indicated In The Technical Documentation Referred To In Point 4 Of Chapter Iii Of The Swz. The Bill Of Quantities Is Of An Auxiliary Nature. The Occurrence, During The Implementation Of The Contract, Of Works Not Included In The Bill Of Quantities Or Of Works In A Larger Quantity Compared To The Quantity Accepted In The Bill Of Quantities Will Not Entitle The Contractor To Demand Additional Remuneration - If These Works Were Included In The Technical Documentation Referred To In Point 4 Of Chapter Iii Swz And Stwior. The Possible Absence Of Works Necessary To Be Performed In The Bill Of Quantities Resulting From The Technical Documentation Does Not Release The Contractor From The Obligatio
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 118152365
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.