|
1. The Subject Of The Order Is To Provide Investor Supervision In The Road, Construction, Sanitary And Electrical Sectors, As Well As Supervision Over Construction Works Carried Out As Part Of The Investment Task Called Increasing The Natural Attractiveness Of The Nadodrzański Recreation Park, Which Includes The Development Of The Area With The Construction Of Lighting And The Necessary Technical Infrastructure, Construction Of A Toilet, A Viewing Terrace For Disabled People, Reconstruction And Renovation Of Engineering Facilities And The Demolition Of An Outbuilding And Carrying Out Plantings Together With Conducting Financial Settlements And Managing The Implementation Of The Investment Task.2. Characteristics Of Construction Works Covered By The Investment Task. Dismantling Of The Crushed Stone Surface - 2404.80 M2, Dismantling Of The Surface Made Of Concrete Cubes. 8Cm Including Ballast - 2608.60 M2, Dismantling Of The Surface From Openwork Concrete Slabs. 8 Cm With Ballast - 337.00 M2, Dismantling The Surface Of Concrete Paving Slabs Thick. 8Cm With Ballast - 2206.60 M2, Stripping Of The Bituminous Surface To Thickness. 10Cm - 3706.00 M2, Demolition Of The Concrete Surface To Thickness. 20Cm - 434.00 M2, Demolition Of The Aggregate Base To Thickness. 20Cm - 4477.00 M2, Dismantling Concrete Edges 30 X 8Cm - 7320.00 M, Dismantling Concrete Curb 30 X 15Cm - 39.00 M, Dismantling Concrete Footing - 265.50 M3, Dismantling Concrete Sandbox Plinths - 5.50 M3, Constructing Water-Permeable Pedestrian Paths Mineral-Epoxy Surface With An Area Of 3,688 M2, Construction Of A Surface Of Washed White Sand With An Area Of 1,005 M2, Construction Of Pedestrian Routes With A Surface Of Concrete Paving Stones With An Area Of 4,269 M2, Hardening Of The Area By Making A Geogrid Surface With An Area Of 251 M2 Filled With Gravel On A Base Of Crushed Aggregate, Leveling The Area With Sowing With A Grass Mixture With An Area Of 2,440 M2 M2, Topsoil Thickness 20 Cm With Grass Mixture Sown With An Area Of 2,565 M2, Construction Of Area Lighting By Construction Of A 3,700 M Long Lighting Cable Line With 88 Pole Positions, Construction Of A 220 M Long Water Supply Connection, Construction Of A 27 M Long Gravity Sewage Connection, Construction Of A 23 M Long Sewage Line, Construction Of Sewage Wells - 3 Pcs., Installation Of Water Springs - 4 Pcs., Land Development By Installing Playground Equipment And Small Architecture, Renovation Of A Bridge Structure 5.90 M Wide With A Total Length Of 15.6 M; Renovation Of A Bridge Structure 5.77 M Wide With A Total Length Of 14 M, Renovation Of A Steel Pedestrian Footbridge With A Length Of 11.03 M; Renovation Of The Promenade With An Area Of 281 M2, Construction Of An Observation Deck 3.6 M Wide And 8.65 M In Total Length; Installation Of Fishing Piers – 3 Pcs.
|