Removal Of Floor Coverings: Wooden, Manual Cleaning Of Facade Surfaces From Ladders From Perchlorvinyl And Oil Paints (Removal Of Old Emulsion From The Wall), Disassembly (Disassembly): Illuminators For Fluorescent Lamps (Disassembly Of Spotlights), Dismantling Of Radiators, Weight: 80 Kg, Dismantling Of Ceiling Covering Elements And Frame: Plastic Panels (Dismantling Of Paneling), Fixing The Joint Layer: Cement, Thickness 20 Mm, Adjustment Of The Joint Layer: Cement, Add Or Subtract To Norm 11-01-011-01 For Every 5 Mm Change In The Thickness Of The Joint Layer (Addition 30Mm), Fixing Of Adhesive Waterproofing With Rolled Materials: 1St Layer In Bituminol Mastic, Fixing Adhesive Waterproofing With Roll Materials: The Next Layer In Bituminol Mastic, Laying Of Lagas: On Cover Pans, Construction Of The Base Of Floors From One Layer Of Plywood: Area Up To 20M2, Making The Whole Heat-Sound Insulation From Pans: Or From Mineral Wool Or Glass Fiber Rolls, Making Covers: From Laminated Boards Using The Key Method
Contact Information
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 118112202
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.