Essential Construction Measuresconstruction Site Setupsetting Up, Maintaining And Clearing A Container Village In The Area Of The Station Forecourtpreparing, Maintaining And Clearing The Construction Site Set-Up Area In The Area Of The Station Forecourtpreparing, Maintaining And Clearing A Storage Area For The Öbb Fd In The Area Of The Fbf. Innsbruckconstruction Site Access East And West Head In The Train Stationsecuring The Construction Site With Track Bracketsremoval Workremoval Of Gravel Framework And Substructure Of The Best. Track Systems Including Switches In The Station Area (Removal Of Track Rust And Switches By Öbb) Removal Determined. House And Island Platform Removal Of Cable Paths Removal Of Switching Stations And Other Sfe Systems Removal Of Overhead Line Masts Including Partial Removal Of Foundations Removal Of Stone Sets, Trenches And Retaining Walls Removal Of Technical Buildings (Signal Box) Removal Of Garden Sheds Removal Of Noise Barriers Removal Of Edge Borders And Asphalt Removal Demolition Of Road Underpass Kranebitterstrasse Partial Demolition And Filling Of Passenger Underpass Railway Facilities Extension Of House Platform Next To Track 3 And Equipment Construction Prov. Platform [200/55] Next To Track 2 Including Access And Equipmentconstruction Of Temporary Platform [200/55] Next To Track 4 Including Access And Equipmentmanufacturing/Widening Railway Embankmenttrench Production And Profiling Worknew Construction Of Substructure Tracks 1, 2, 3, 4 And 5Bnew Construction Of Island Platform [220/55] Between Track 1 And Track 2New Construction Of House Platform [200/55] Next To Track 3, Paving Work On The Platforms And Access Area Including Tactile Guidance System, Foundation, Equipment Elements, Construction Of Cable Routes Including Track Crossings (Cable Troughs, Cable Ducts, Pipe Routes, Etc.), Other Sfe Work (Cable Work, Track Junction Boxes, Etc.), Cable Laying Work (Cable Design And Installation Via Third Parties), Construction Of Drainage (Longitudinal Drainage As Well As Road Inlet And Inspection Shafts) On The Island Platformconstruction Of Drainage (Longitudinal And Drainage Drainage As Well As Control Shafts) Between Track 1 And Track 3 As Well As Track 2 And Track 4Construction Of Seepage Systemsconstruction Of Noise Protection Walls Ballasted Track Systemsartificial Buildingsnew Construction Of The Kranebitterstraße Road Underpassnew Construction Of The North Retaining Wallnew Construction Of The South Retaining Wallnew Construction Of The Forecourt Retaining Wallnew Construction Of The Passenger Underpasshigh-Rise Buildingsno Buildings In The Classic Sense Will Be Built In The Course Of This Tender. Services For Equipment (Fine Stone, Doors, Tiles, Etc.) Of The New Passenger Underpass Sfe Work Free Route Foundation Sfe Systems (Signals, Overhead Lines, Etc.) Construction Of Cable Routes Including Track Crossings (Cable Troughs, Cable Shafts, Pipe Routes, Etc.) Clean Cable Trough Of Vegetation Uncover Best. Cable Routerecabling Route Sectioninserting Trough Tapecovering Cable Routerenewing Trough Coverother Sfe Work (Cable Work, Track Junction Boxes, Etc.)Cable Laying Work (Cable Design And Installation Via Third Parties)Cable Relocationasphalt Removalmanufacturing Cunette With Trench Protectionproducing Beddingclosing Cunetteasphalting
Contact Information
Contact No.
+4366488417500
Email
isabella.koell@oebb.at
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 118087896
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.