1. The Subject Of The Order Is: Modernization Of The Sanitary Sewage Network In The Olszyna Commune Under Measure Fenx.09.01 Reconstruction Of Water And Sewage Infrastructure Of Priority Fenx.09 Support For Post-Flood Areas From The Cohesion Fund Of The European Funds For Infrastructure, Climate, Environment 2021-2027 Program. 2. The Scope Of The Construction Project Includes: Pumping Stations * Disassembly Of Existing Sewage Pumping Station Equipment, Including Removal And Disposal. * Disassembly Of Tank Elements: Manhole Steps, Bridge, Electrical And Automation Installations With Accessories, Along With Removal And Disposal. * Disassembly Of The Existing Reinforced Concrete Well Cover Fi2000, Including Removal And Disposal. Disposal.*Delivery And Assembly Of Devices And Elements Of The Pumping Station Along With Piping - In Accordance With Annex No. 1/Ps3 - Description Of Technical Requirements Of The Device.*Delivery And Assembly Of A Complete Power Supply And Control Switchgear (Control Cabinet) Along With The Implementation Of The Electrical And Control Installation.* Tests And Commissioning Of The Pumping Station, Authorization, Training Of Staff.* Preparation Of As-Built Documentation In The Form Of At Least A Diagram. Hydraulic Pumping Station With Dtr.* Expansion Of The Monitoring System With An Object Included In The Scope Of The Task Consisting In Connecting To The Existing Gprs Monitoring And Visualization System - In Accordance With Annex No. 3/Ps3 - Description Of The Functional And Utility Parameters Of The Existing Monitoring System In Gsm/Gprs Technology Permanent Ip Addressing Of Objects Protected With The Apn System.* Delivery And Installation Of A New Reinforced Concrete Well Cover.* Delivery And Installation Of A Deflector.* Delivery And Installation Of A Service Platform.* Delivery And Installation Of Ladders With Manhole Steps.* Delivery And Installation Of A Handrail Inside The Tank.* Delivery And Installation Of A Manhole In The Supplied Well Cover.* Delivery And Installation Of Ventilation Chimneys.* Delivery And Installation Of Beams, Guides And Chains For Pumps.* Providing Additional Mechanical Ventilation Of The Pumping Station Chamber For The Duration Of The Works.* Providing A Crane For Unloading And Assembly.* Pressure Washing Of The Pressure Pipeline With Water And Equipment. Note: • All Devices Will Be Installed In The Existing Tank, • All Existing Devices And Sewage And Electrical Piping Inside Must Be Dismantled, Removed And Disposed Of And Outside The Tank. Sewage Compressing Stations * Disassembly Of The Existing Sewage Pumping Station Module And Other Sewage Equipment In The Pumping Station Tank, Including Removal And Disposal.* Disassembly Of Tank Elements: Manhole Steps, Electrical And Automatic Installation With Accessories, Along With Removal And Disposal.* Dismantling Of The Existing Cover On The Reinforced Concrete Well 3000 Fi3000, Including Removal And Disposal.* Delivery, Installation In The Tank An
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 118082134
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.