Construction Work – Development Of The Zsóry Spa And Beach Spa. The Outdated And Dilapidated Lap And Wave Pool Complex Will Be Demolished In Its Entirety, And New Pools, Thematic Units, Service Facilities, As Well As Related Mechanical, Hydraulic, Electrical, Building Automation, Environmental Planning And Accessibility Elements Will Be Built In Its Place. The New Wave Pool Will Form The Main Axis Of The Renewed Aquatic World. This Is Surrounded By The Curved Experience And Cascade Pools, As Well As The Slow And Fast River Pool, Evoking The Shape Of The Circular Pool Doomed To Be Demolished, In A Mirror-Symmetric Arrangement. The Service Building Is Located On The South Side Of The Complex, Between The Wave Pool And The Slow And Fast River Pool, And Its Exterior Appearance, Color And Design Fit Into The Matyó Thematic Concept. The Main Elements To Be Demolished Of The Existing Pool Complex Affected By The Development Are Approx. Round Pool With A Water Surface Of 2,700 M², Approx. A Wave Pool With A Water Surface Of 784 M², As Well As The Related Paved, Mechanical And Service Elements. The Area Affected By The Intervention Is Connected To A Pool Group With A Floor Area Of Approximately 90 X 90 M. 1. Pools There Are 7 Pools In The Pool Group: Wave Pool - Water Surface: 709 M², Water Depth: 0-152 Cm, Water Temperature: 28 °C. Sitting Experience Pool / Cascade Pool - Water Surface: 166 M², Water Depth: 110 Cm, Water Temperature: 32 °C. Standing Adventure Pool / Cascade Pool - Water Surface: 149 M², Water Depth: 130 Cm, Water Temperature: 32 °C. Adult Pool - Water Surface: 145 M², Water Depth: 135 Cm, Water Temperature: 30 °C. Slow And Fast River - Water Surface: 213 M², Water Depth: 135 Cm, Water Temperature: 32 °C. Family Adventure Pool - Water Surface: 130 M², Water Depth: 110 Cm, Water Temperature: 32 °C. Family Paddling Pool And Baby Pool - Water Surface: 120 M², Water Depth: 0-40.3 Cm, Water Temperature: 32°C. Between The Pools, 3 Water Experience Areas Will Be Created: Fountain. Trampled. Water Playground - Water Surface: 185 M², Water Depth: 0-23 Cm, Water Temperature: 30 °C. In Connection With The Pools, Monolithic Reinforced Concrete Pool Structures, Pool Walls, Bottom Plates, Compensating Reservoirs, Engine Houses, Shafts, Retaining Walls, Water Circulation And Experience Element Systems, As Well As The Related Covering, Waterproofing And Specialized Installation Works Are Realized. The Total Construction Area Is Approximately 6,650 M². The Water Surface Of The Wave Pool Is Approx. 708.60 M², The Area Of The Associated Engine Room Approx. 398.75 M²; The Total Length Of The Wave Pool And Machine House Is 57.50 M, Its Greatest Width Is 35.53 M. The Size Of The Engine House On The South Side Is 13.30 X 10.48 M, Its Area Is Approx. 386.7 M², The Size Of The Courtyard Water Machine House Is 8.4 X 10.0 M. Next To The Wave Pool, 2 Shafts, Each With A Floor Area Of 3 X 3 M, Are Being Built. As Part Of The Water Engineering Works, A Filter-Rotator, Balancer, Chemical Dispenser, Experience Element And Water Treatment System Will Be Installed For All Pools. The Main Operational Parameters: Wave Pool 475.03 M³ Water Volume And 445.4 M³/H Rotation Power; Slow And Rapid Flow 255.6 M³ Water Volume And 167.8 M³/H Rotation Capacity; Adult Pool 174 M³ Water Volume And 87 M³
|