4.1 The Subject Of The Order Is The Performance Of Construction Works As Part Of The Task Construction Of A Connector Of Toruńska Street With Chełmińska Street In Lisewo. 4.2 The Scope Of The Subject Of The Order Includes The Performance Of Construction Works In The Following Industries: 1) Road Industry - Construction Of Road Structures And Surfaces, Construction Of Exits, Sidewalks And Roadsides; 2) Electrical Industry - Construction Of Road Lighting; 3) Sanitary Industry - Construction Of Rainwater Drainage Systems; 4) Industry Telecommunications - Construction Of A Technological Duct. As Part Of The Implementation Of The Subject Of The Order, The Following Should Be Performed In Particular: 1) Preparatory Works, Including Surveying Works And Removal Of The Topsoil Layer; 2) Earthworks, Including Excavations And Embankments; 3) Road Construction, Including: O Profiling And Compaction Of The Subgrade, O Execution Of A Layer Of Improved Sand Subsoil, O Execution Of A Frost-Protective Layer Of Cement-Stabilized Sand, O Execution Of The Base Base Made Of Crushed Aggregate Mechanically Stabilized, O Mechanical Cleaning And Sprinkling With Asphalt Emulsion Of The Base And Binder Layer; 4) Construction Of Exits, Including: O Profiling And Compaction Of The Base, O Construction Of A Layer Of Improved Base Made Of Cement-Stabilized Sand, O Execution Of A Base Made Of Mechanically Stabilized Crushed Aggregate; 5) Construction Of Sidewalks, Including: O Profiling And Compaction Of The Base, O Construction Of A Layer Of Improved Base Made Of Stabilized Sand Cement;6) Road Surface, Including: O The Binding Layer Of Ac16w Asphalt Concrete, 5 Cm Thick, O Laying Of The Ac11s Asphalt Concrete Wearing Layer, 4 Cm Thick; Lighting Poles, O Installation Of Lighting Fixtures; 10) Rainwater Drainage, Including: O Construction Of Channels From Pvc Pipes, O Construction Of Sewage Wells, O Construction Of Sewage Wells, O Connection Of Existing Sewers, O Connection Of The Designed Sewage System To The Existing Inspection Well, O Performance Of Tightness Tests, O Installation Of Protective Pipes; Road Traffic, As Well As For The Needs Of Telecommunications Lines With Power Supply And Power Lines Not Related To The Needs Of Road Management Or Road Traffic;12) Finishing And Other Works, Including, Among Others, Execution Of Vertical And Horizontal Markings And Other Elements Resulting From The Design Documentation; The Total Length Of The Constructed Road Section Is 370.59 M.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 117939749
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.