|
Architectural, Engineering And Planning Services - Győr, 821. Main Road - Kálvária Street Planning. In Győr, State-Owned And Magyar Közút Nzrt. 821, Owned By The City Of Győr And Managed By The Győr Mjv Road Management Organization, The Existing Traffic Light Junction At The Junction Of Kálvária Street Will Be Transformed Into A Roundabout Controlled By Traffic Lights, With The Reconstruction Of The Necessary Traffic Management System, New Street Lighting, Rainwater Drainage And The Replacement Of The Affected Water Utilities, High And Low Current Utilities, And Communication Utilities, As Well As The With The Partial Renovation Of Kálvária Street And The Related Pedestrian And Bicycle Paths. The Designers Task Will Be To Review The Existing Design Documents, Revise Them As Necessary, Prepare Any Documents That May Still Be Needed, Support The Contracting Authority During The Public Procurement For The Selection Of The Contractor, And As An Optional Task - In The Case Of An Order For This - Provide Design Supervision. Main Planning Tasks: 1. Preparation Of Road Construction, Pedestrian And Bicycle Path Construction And Traffic Technical Licensing And Construction Plan, With Revision And Revision Of The Existing Plans; 2. Design Of Traffic Control With Signal Lights, No. 821. Planning The Coordination Of Traffic Lights On The Main Road 3. Preparation Of The Permit And Construction Plan For Water Pipelines And Storm Water Drainage By Reviewing, Updating And, If Necessary, Redesigning The Existing Plans, And Then Approving The Plans; 4. Public Lighting Planning By Revising, Modernizing And, If Necessary, Redesigning Existing Plans; 5. Planning The Replacement Of Electrical Networks And The Construction Of Low-Current Networks By Reviewing, Modernizing And, If Necessary, Redesigning The Existing Plans; 6. Planning The Replacement Of The Cable Providers Infrastructure And Overhead Network, By Revising, Modernizing And, If Necessary, Redesigning The Existing Plans; 7. Planning The Replacement Of The Telecommunications Service Providers Core And Distribution Network, By Revising, Modernizing And, If Necessary, Redesigning The Existing Plans; 8. Replacement Of The Drinking Water Pipeline Network, Preparation Of Authorization And Implementation Plans By Reviewing, Updating And, If Necessary, Redesigning The Existing Plans 9. Replacement Of The Sewage Network, Preparation Of Authorization And Implementation Plans By Reviewing, Updating, And If Necessary Redesigning The Existing Plans. 10. Preparation Of Other Replacement Plans Due To Public Utility Concerns That May Arise During The Planning Process; 11. Preparation Of A Green Area Plan By Revising, Updating And, If Necessary, Redesigning Existing Plans; 12. Preparation Of Biological Activity Value Calculation, By Revising, Updating And, If Necessary, Redesigning The Existing Plan; 13. Preliminary Archaeological Documentation) Preparation And Submission For Approval; 14. Preparation Of Operator Delimitation, By Revising And Updating Existing Plans; The Main Estimated Design Parameters Based On The Previously Issued Permits: Road Construction:
|