3) Task A - Construction Of A Retention Reservoir At Ul. Żurawia In Kruszyn: A) The Order Covers The Implementation Of Construction Works As Part Of The Project Titled: Construction Of A Retention Reservoir At Ul. Żurawia In Kruszyna, Construction Works Consist In The Construction Of A Retention Reservoir In The Town Of Kruszyna Based On Decision No. 72/2024 Of February 16, 2024 Issued By The Starosta Of Zielona Góra Approving The Plot Development Project And The Architectural And Construction Design And Granting A Construction Permit Covering The Construction Of A Retention Reservoir With The Necessary Accompanying Infrastructure - On The Plots With Registration Numbers 495/7, 493/13, 491/5, 502, 498/3, 500/12, 500/11, 498/2, 498/1, 493/7, 497/4, 497/3, Krężoły District And On The Plots With Registration Numbers 10/58, 10/59, 18/9, 18/10 Kruszyna District. B) The Scope Of Works Includes The Construction Of A Retention Reservoir With The Necessary Elements, Which Include: Felling Of Trees. Construction Of The Reservoir. Renovation Of Ditches R-S4, R-S47, R-S26, R-S20, R-S17, No Name. Reconstruction Of Ditches R-S20, R-S48, R-S27, R-S17. Construction Of The P1 Culvert Ø1000 Mm With A Penstock - Exit From The Street Żurawia. Construction Of The P2 Culvert Ø800 Mm. Construction Of The P3 Culvert Ø800 Mm. Construction Of Gates No. 1 And No. 2 Ø800 Mm On The R-S48 And R-S20 Ditches. Construction Of Inlet No. 1 To The Tank Ø800 Mm With A Gate. Construction Of Inlet No. 2 To The Tank Ø800 Mm With A Gate. Construction Inlet No. 3 To The Tank Ø800 Mm With A Gate. Construction Of Outlet No. 4 To The Tank Ø1000 Mm With A Gate. Hardening Of The Access Road To The Work Area. Planting Greenery. Pumping Water For The Duration Of Construction Works. Constructing A Well For Emptying The Tank. Securing The Outlets With Sheet Pile Walls. The Detailed Scope Of The Subject Of The Contract Is Determined By The Following Designs: Land Development, Technical, Executive, Cutting, Greenery, Technical Specification For The Execution And Acceptance Of Works, Temporary Traffic Organization Design Prepared By Esko-Consulting Sp. Z O. O. Based In Zielona Góra. The Ordering Party Recommends Performing A Site Visit Before Submitting An Offer For The Task Due To Difficult Hydrotechnical Conditions And A Detailed Analysis Of The Design And Geological Documentation In This Respect. The Investment Will Be Implemented With Funds From The European Funds For The Lubuskie Voivodeship 2021-2027 Program, Priority Felb.02 European Funds For The Green Development Of The Lubuskie Voivodeship, Measure Felb 02.07. Adaptation To Climate Change Zit, Type Iv Supporting Small Retention. C) The Contractor Will Carry Out The Works Using New Own Materials, Which He Will Purchase And Deliver To The Work Site At His Own Expense And Risk. The Cost Of Purchase And Delivery In Place Of Installation Of All Materials Used To Implement The Subject Of The Contract Is Included In The Contractors Remuneration R
|