4.1.The Subject Of The Study Is The Expansion And Reconstruction Of The Building Of The Municipal Kindergarten No. 2 As Part Of The Task Entitled: Improving The Energy Efficiency Of Public Buildings In The Area Of Mof Łuków - Comprehensive Energy Modernization Of The Building Of The Municipal Kindergarten No. 2 In Łuków Along With Its Expansion And Reconstruction. 4.2.The Expansion And Reconstruction Of The Building Of Municipal Kindergarten No. 2 Will Include, Among Others: 4.2.1.Improving Thermal Insulation In The Existing Building And Adapting The Building To The Applicable Provisions Of The Construction Law And Fire Protection Regulations. The Plan Was To Expand The Building On The North Side With A New Entrance Zone With A Vertical Lift To Provide Access To The Building For Disabled People On The Ground Floor, And To Expand Above This Zone On The First Floor Of The Building With New Rooms, I.E. Specialists Offices, Utility Room. Authorizing Officer And Expansion On The Eastern Side With A New Freight Elevator Along With The Reconstruction Of The Existing Staircase, As Well As Reconstruction Of The Existing Main Staircase, Management Rooms And A Public Toilet And Adapting It For Disabled People. In Addition, The Plan Included Widening The Escape Routes, Rebuilding The Kitchen Facilities With The Stewards Room And A New Kitchen Elevator, A Toilet For The Classroom On The First Floor, A New Toilet For Employees, Storage Lockers And On The Basement Floor A Dining Room, A Toilet And A New Rebuilt Room For The Maintenance Man, A Laundry Room, A Server Room, And A Room. Technical Facilities, A Cloakroom For Personal Clothing For Kitchen And Room Workers. Economic,4.2.2.Performance Of Thermal Modernization And Façade Works (Including External Wall Insulation, Façade Cladding, Dismantling And Installation Of New Window And Door Joinery, Replacement And Installation Of Sheet Metal Flashings), 4.2.3.Execution Of Internal Finishing Works (Including Plastering And Wall Cladding Works, Floor Surfaces), 4.2.4.Land Development, Demolition Works, Including The Construction Of A Hardening Made Of Paving Stones With A Substructure, Installation Works, Raising The Measuring System With Notification Of The Above-Mentioned Works To Pge Dystrybucja S.A. Based On The Elevation Conditions Of The Measurement System,4.2.5.Execution Of Electrical Installations - Fire Protection Switch, Basic, Emergency And Evacuation Lighting Installation, Installation Of Plug Sockets And Power Supply For Devices, Lightning Protection And Earthing Installation. Construction Of Photovoltaic, Telecommunications And Low-Current Installations (Structured Cabling, Wifi, Video Monitoring, Sound And Radio Systems, Anti-Burglary Installations, Intercom System, Smoke Removal System, Induction Loop System For The Hearing Impaired, 4.2.6. Execution Of Internal Sanitary Installations And Related Dismantling Works. Construction Of Water Supply, Fire Protection, Sanitary Sewage, Central Heating, M
|