|
Part I Reconstruction With A Change In The Use Of Part Of The Rooms Of The School Building For The Needs Of The Existing Kindergarten In Koszyce Wielkie (Plot 708/11) Along With The Renovation Of The Playground On Plot No. 708/11 In Koszyce Wielkie. Scope: 1) Demolition Works: - Dismantling Of Walls, Walls, Pillars, - Carving Out, Chiseling. 2) Walling Up 3) Window And Door Joinery, Window Sills, Window Sills. 4) Finishing Works: - Plastering, - Facing Walls With Ceramic Tiles, - Floors, - Painting With Leveling/Smoothing Of Walls, - Welding Of Roll Carpets, 5) Adapting The Facility For Disabled People: - Leveling The Cube, - Marking Parking Spaces And Entrances, - Changing The Location And Parameters Of Intercoms, - Information System, - Construction Of Ramps For The Disabled.6) Installation Electrical: - Disassembly, - Rp-1 Switchboard, Assembly, - Internal Electrical Installation, - Computer Installation, - Alarm Installation, - Video Monitoring Installation, - Access Control Installation, - Portable Induction Loop.7) Sanitary Installations: - Dismantling Works Of The Central Heating Installation, - Central Heating Installation, - Hot And Cold Water Installation, - Sewage Installation Sanitary, - Fire Protection Installation, - Air Conditioning, - Mechanical Ventilation. 8) Renovation Of The Playground: - Earthworks And Demolition, - Surfaces, - Equipment, - Greenery. The Detailed Scope Of Works Was Specified In The Design Documentation, Including The Construction And Architectural Design (Pab), The Land Development Design (Pz), The Technical Design (Pt), The Specification Technical Execution And Acceptance Of Works (Stwior) And Bills Of Quantities. The Volume Of The Facility After Reconstruction Is Approx. 20,000 M3. Note: Section 4 Greenery, Playground, Is Taxed At The Rate Of 8% Of The Vat Tax.
|