|
1 The Subject Of The Order Is The Renovation Of A Multi-Family Residential Building Along With Insulation, Change Of Colors And Change Of Heating Method - Located In Strzelce Opolskie At Ul. Ujazdowska 2.2 The Scope Of The Order Includes In Particular: Scope Of Construction Works 1. Insulation Works A) Thermal Insulation Of 12 Cm Thick Styrofoam (Λ=0.033 W/Mk) Of External Walls In The Etics System And 12 Cm Thick Mineral Wool (Λ=0.035 W/Mk), B) Insulation Of The Walls Of The Attic Apartment With 12 Cm Thick Mineral Wool (Λ=0.037 W/Mk), C) Insulating The Ceiling Of The Attic Apartment With Mineral Wool, Loosely Laid On The 15 Cm Thick Ceiling (Λ=0.037 W/Mk), D) Insulating The Ceiling Above The Top Floor Of The Apartment With 15 Cm Thick Mineral Wool (Λ=0.035 W/Mk), Laid Between The Joists. 2. Accompanying Works: A) Removing All Unnecessary Elements On The Facade (Cables, All Types Of Handles, Etc.), B) Dismantling The Existing Insulation Layer, C) Removing Loose Plasters And Replacing Them, D) Removing Concrete Window Sills (Does Not Apply To Cornices In The Corners Of The Building), Removing Window Sills Made Of Tiles And Dismantling Steel Window Sills, E) Relocating Antennas And Boards With The Address Of The Building, Etc., F) Replacement Of Flag Holders, G) Replacement Of Ventilation Grilles With Aluminum Ones, H) Replacement Of Ventilation Chimneys, I) Replacement Of Window Sills With Ones Made Of Titanium Zinc, 0.70 Mm Thick, J) Replacement Of Gutters And Downpipes With Ones Made Of Titanium Zinc, 0.7 Mm Thick, K) Replacement Of Sheet Metal Flashings With Ones Made Of Titanium Zinc, 0.7 Mm Thick, L) Installation Of An Osb Board At The Gable Walls To Place A Layer Of Insulation And Installation Of New Flashing Adapted To The Existing Flashing - The Rear Part Of The Building, Ł) Replacement Of The Roof Covering Over The Canopies At The Entrance To The Membrane, M) Insulation Of Dormers With Flashing (The Dormer On The Side Of Plot No. 2071 Should Be Insulated With 12 Cm Thick Mineral Wool (Λ = 0.035 W/Mk), The Remaining With Styrofoam With A Thickness 12 Cm (Λ = 0.033 W/Mk) And Replacing The Formwork With Non-Flammable Boards, N) Replacing The Intercom System And Installing An Intercom With A Uniphone, O) Installing An Aluminum Information Board (70X100 Cm) In The Staircase, P) Replacing The Attic Door - Ei 30 Steel Doors, R) Replacing The Basement Door - Ei 30 Steel Doors, S) Replacing Basement And Dormers (With U Coefficient = 0.90W/M²*K) Maintaining The Existing Division, White Frames, T) Construction Of A Fire Protection Switch. – According To A Separate Study, U) Replacement Of The Mailbox, V) Replacement Of Lamps Outside The Building With Led Lamps With Motion Sensors, W) Renovation Of Chimneys With Mineral Wool Insulation, X) Restoration Of Grooves On The Surface Of Cornices, Y) Renovation Of The Staircase (Renovation With Raising The Stair Railings, Painting The Staircase, Securing And Painting The Steel Structure Of The Flights Of Sta
|