|
Bids Are invited for Evapouration Fabrication Work 1 - Evaporation House Dismantling Damaged Pipelines At Various Locations, Disposing Of Them In The Scrap Yard, And Installing New Pipelines (8Inch) , Evapouration Fabrication Work 2 - Evaporation House Dismantling Damaged Pipelines At Various Locations, Disposing Of Them In The Scrap Yard, And Installing New Pipelines (6Inch) , Evapouration Fabrication Work 3 - Evaporation House Dismantling Damaged Pipelines At Various Locations, Disposing Of Them In The Scrap Yard, And Installing New Pipelines (4Inch) , Evapouration Fabrication Work 4 - Evaporation House Dismantling Damaged Pipelines At Various Locations, Disposing Of Them In The Scrap Yard, And Installing New Pipelines (2Inch) , Evapouration Fabrication Work 5 - Evaporation House Fabricating And Installing Bends At Various Locations (8Inch) , Evapouration Fabrication Work 6 - Evaporation House Fabricating And Installing Bends At Various Locations (6Inch) , Evapouration Fabrication Work 7 - Evaporation House Fabricating And Installing Bends At Various Locations (4Inch) , Evapouration Fabrication Work 8 - Evaporation House Fabricating And Installing Bends At Various Locations (3Inch) , Evapouration Fabrication Work 9 - Evaporation House Fabricating And Installing Bends At Various Locations (2Inch) , Evapouration Fabrication Work 10 - Evaporation House Fabricating And Installing Flanges At Various Locations (24Inch) , Evapouration Fabrication Work 11 - Evaporation House Fabricating And Installing Flanges At Various Locations (10Inch) , Evapouration Fabrication Work 12 - Evaporation House Fabricating And Installing Flanges At Various Locations (8Inch) , Evapouration Fabrication Work 13 - Evaporation House Fabricating And Installing Flanges At Various Locations (6Inch) , Evapouration Fabrication Work 14 - Evaporation House Fabricating And Installing Flanges At Various Locations (4Inch) , Evapouration Fabrication Work 15 - Evaporation House Fabricating And Installing Flanges At Various Locations (2Inch) , Evapouration Fabrication Work 16 - Evaporation House Fabricating And Installing Nipples At Various Locations (800 Mm) , Evapouration Fabrication Work 17 - Evaporation House Fabricating And Installing Nipples At Various Locations (10Inch) , Evapouration Fabrication Work 18 - Evaporation House Fabricating And Installing Nipples At Various Locations (8Inch) , Evapouration Fabrication Work 19 - Evaporation House Fabricating And Installing Nipples At Various Locations (6Inch) , Evapouration Fabrication Work 20 - Evaporation House Fabricating And Installing Nipples At Various Locations (4Inch) , Evapouration Fabrication Work 21 - Evaporation House Fabricating And Installing Nipples At Various Locations (3Inch) , Evapouration Fabrication Work 22 - Evaporation House Opening And Closing Valves At Various Locations (8Inch) , Evapouration Fabrication Work 23 - Evaporation House Opening And Closing Valves At Various Locations (6Inch) , Evapouration Fabrication Work 24 - Evaporation House Opening And Closing Valves At Various Locations (4Inch) , Evapouration Fabrication Work 25 - Evaporation House Opening And Closing Valves At Various Locations (3Inch) , Evapouration Fabrication Work 26 - Evaporation House Opening And Closing Valves At Various Locations (2Inch) , Evapouration Fabrication Work 27 - Evaporation House Fabricating And Installing A Tee (4Inch) , Evapouration Fabrication Work 28 - Vapor Cell/Quad Body Remove Old Brass/S.S. Tubes, Weigh Them, Place Them In The Store/Specified Location, Fit And Expand The Tubes, And Carry Out A Satisfactory Hydraulic Test At 75 To 100 Psi (Tube Size 42 X 45 X 2010 Mm). , Evapouration Fabrication Work 29 - Vapor Cell/Quad Body Fit New Brass/S.S. Tubes, Expand Them, And Carry Out A Satisfactory Hydraulic Test At 75To100 Psi (Tube Size 42 X 45 X 2010 Mm). , Evapouration Fabrication Work 30 - Hydraulically Test Of Various Bodies And Give Satisfactory Trial At 75 To 100 P.S.I. , Evapouration Fabrication Work 31 - Juice Heater Remove The Installed 400 Mm Diameter Valve And Fabricate Approximately 5 Meters Of 400 Mm Diameter Pipeline From A 10 Mm Plate, Install It With The Valve In The Calandria, And Carry Out A Satisfactory Trial. , Evapouration Fabrication Work 32 - Juice Weighing (Round Tank) Cut Out And Remove The Damaged Shell, Dispose Of It In The Scrap Yard, Fabricate A New Shell From An 8/10 Mm Thick Plate, Install It, Reconnect All Related Connections, And Carry Out A Leak-Proof Trial. (Height 1.35 M, Diameter 2.66 M, Channel Size 200 Mm) , Evapouration Fabrication Work 33 - Raw Juice Pump Cut Out And Remove The Damaged 14Inch Header, Fabricate And Install A New Header, Reconnect All Related Connections, And Carry Out A Leak-Proof Trial. , Evapouration Fabrication Work 34 - Raw Juice Receiving Tank Cut Out And Remove The Damaged Shell, Dispose Of It In The Scrap Yard, Fabricate A New Shell From An 8/10 Mm Thick Plate, Install It, And Carry Out A Leak-Proof Trial. Diameter 3.5 M X Height 3.0 M. , Evapouration Fabrication Work 35 - Vapor Cell 950 Sq. M And Old Quad Body No. 4 Remove Damaged Sections Of The Sidewall And Umbrella, Fabricate And Install New Parts, And Conduct A Trial. Approx. 2 M (Size 2 X 2.0 M). , Evapouration Fabrication Work 36 - New Quad Bodies No. 1 And 2 Remove Damaged Sections Of The Sidewall And Umbrella, Fabricate And Install New Parts, And Conduct A Trial. Approx. 2 M (Size 1 X 1.5 M). , Evapouration Fabrication Work 37 - Fabricate An M.S. Bed For The Syrup Pump And Motor, Complete Fitting And Alignment, And Carry Out A Satisfactory Trial. 25Hp , Evapouration Fabrication Work 38 - Old Set Vertical Line Juice Heater And Quad Body No. 4 Dismantle The Damaged Condensate Bottle, Dispose Of It In The Scrap Yard, Fabricate A New One From An 8/10 Mm Plate, Complete All Connections, And Carry Out A Satisfactory Vacuum Trial. , Evapouration Fabrication Work 39 - Dismantle The 800 Mm Diameter Exhaust Pipeline Below The Turbine, Including Nipple, Bend, And Flange, And Dispose Of It In The Scrap Yard. , Evapouration Fabrication Work 40 - Fabricate A New 800 Mm Diameter Exhaust Pipeline Below The Turbine From A 10/12 Mm Plate, Install It In Position, And Carry Out A Satisfactory Trial. , Evapouration Fabrication Work 41 - Dismantle 800 Mm Diameter Exhaust Pipeline Below The Vapor Cell 950 Sq. M , Dispose Of In Scrap Yard , Evapouration Fabrication Work 42 - Fabricate And Install An 800 Mm Diameter Exhaust Pipeline Below The Vapor Cell 950 Sq. M Using A 12 Mm Plate, And Carry Out A Satisfactory Trial. , Evapouration Fabrication Work 43 - Fabricate And Install An 800 Mm Diameter Tee For The Exhaust Pipeline Below The Vapor Cell 950 Sq. M Using A 12 Mm Plate, And Carry Out A Satisfactory Trial. , Evapouration Fabrication Work 44 - Fabricate And Install An 800 Mm Diameter Dummy/Flange For The Exhaust Pipeline From A 12 Mm Plate And Carry Out A Satisfactory Trial. , Evapouration Fabrication Work 45 - Semikestner 1000 Sq. M Dismantle The Damaged Portion Of The Vapor Saucer, Dispose Of The Scrap In The Scrap Yard, Fabricate A Replacement From A 12 Mm Thick Plate, Reconnect All Related Connections, And Carry Out A Satisfactory Trial. Size Diameter 3.4 M. , Evapouration Fabrication Work 46 - Old Quad Bodies No. 2 And 3 Dismantle The Damaged Portion Of The 20Inch Vapor Pipe, Dispose Of The Scrap In The Scrap Yard. Length 16 M. , Evapouration Fabrication Work 47 - Old Quad Bodies No. 2 And 3 20Inch Vapor Pipe, Fabricate And Install A Replacement From An 8 Mm Thick Plate, And Carry Out A Satisfactory Trial. Length 16 M. , Evapouration Fabrication Work 48 - Dismantlling The 32Inch Size Valve Of The Vapor Pipe Of The 1000 Sq. M. Vapor Cell. , Evapouration Fabrication Work 49 - Erection 32Inch Size Valve Of The Vapor Pipe Of The 1000 Sq. M. Vapor Cell. , Evapouration Fabrication Work 50 - Juice Heater Header Remove All Partition Plates By Cutting, Thoroughly Clean The Tube Plate, Fabricate And Install New Circular And Straight Partition Plates From A 10/12 Mm Plate, Prepare The Header As Before Using M.S. Strips, Fit Rubber Strips, And Carry Out A Satisfactory Trial. , Evapouration Fabrication Work 51 - Semi Kestner 800 Sq. M Cut Out And Remove The Damaged Portion Of The Steam Jacket, Dispose Of It In The Scrap Yard, Fabricate A Replacement From An 8 Mm Plate, Install It In Position, And Carry Out A Satisfactory Trial. , Evapouration Fabrication Work 52 - New Quad Set Dismantle The 800 Mm Vapor Pipe. Approx. 34 M. , Evapouration Fabrication Work 53 - New Quad Set 800 Mm Vapor Pipe, Fabricate A Replacement From A New 8/10 Mm Plate, Install It In Position, And Carry Out A Satisfactory Trial. Approx. 34 M. , Evapouration Fabrication Work 54 - New Quad No. 2 Dismantle The 600 Mm Vapor Pipeline. Length 10 M. , Evapouration Fabrication Work 55 - New Quad No. 2 600 Mm Vapor Pipeline And Fabricate And Install A Replacement From An 8/10 Mm Thick Plate. Length 10 M. , Evapouration Fabrication Work 56 - Juice Heater Dismantle The Incoming And Outgoing Boxes, Heater Shell, And Partition Plate Between The Double-Beat Valve And The Heater Header, Fabricate New Components From A 12/10 Mm Plate As Before, Install Them, And Carry Out A Satisfactory Trial. , Evapouration Fabrication Work 57 - New Quad Body No. 4 Dismantle The Damaged External Catcher/Vapor Body Section And Corroded Angle Channel, Dispose Of The Scrap In The Scrap Yard, Fabricate A New Catcher From A 10 Mm Thick Plate, Install It In Position, Complete All Connections, And Carry Out A Satisfactory Trial. Diameter 1.6 M, Length 6.2 M. , Evapouration Fabrication Work 58 - Etp House Dismantling Damaged Pipelines At Various Locations, Disposing Of Them In The Scrap Yard, And Installing New Pipelines (6Inch) , Evapouration Fabrication Work 59 - Etp House Fabricating And Installing Bends At Various Locations (4Inch) , Evapouration Fabrication Work 60 - Aeration Tank Dismantle The Installed Diffuser, Dispose Of It In The Scrap Yard, And Replace The Damaged Portion. , Evapouration Fabrication Work 61 - Sulphate Removal Plant Reaction Chamber Dismantle The Damaged 6 Mm Partition Plate, Dispose Of It In The Scrap Yard, And Fabricate And Install A New Partition Plate From An 8 Mm Plate.
|