1. Name Of The Task Assigned By The Ordering Party: Reconstruction Of District Road No. 3278D, Km 2+060- 4+721 [Flood - September 2024] - Zabłocie, Stage I: Km 3+708 - 4+708.2. The Subject Of This Public Procurement Is: Construction Works.3. The Scope Of The Subject Of The Order Includes: 1) Preparatory And Measuring Works; 2) Carrying Out Protection And Maintenance Works Within The Existing Tree Stand; 3) Execution Of Demolition Works, Including Milling Of The Existing Bituminous Surface And Dismantling Of Bituminous Surfaces, Concrete Cubes, Openwork Slabs, Concrete, Sewage, Curbs And Edges, Along With The Removal And Management Of Demolition Materials; 4) Execution Of Earthworks, Including Trenching Under The Construction Layers Of The Surface Along With Profiling And Compaction Of The Subgrade; 5) Construction And Construction Of The Road Surface Of The Kr2 Traffic Category, Including A Base Made Of A Mixture Made Using Mce Cold Recycling Technology, A Binder Layer Of Ac16w Asphalt Concrete And A Wearing Course Of An Ac11s Mineral-Asphalt Mixture; 6) Construction Of Slopes With A Surface Made Of A Mineral-Asphalt Mixture, Along With The Implementation Of A Frost Protection Layer, A Crushed Aggregate Base, An Ac16w Binding Layer And An Ac11s Wearing Course; 7) Construction Of Sidewalks From Concrete Paving Stones, Along With The Implementation Of A Frost-Protective Layer And A Base Of Crushed Aggregate; 8) Construction Of Roadsides From Crushed Aggregate And Sewage From Granite Cubes 10, Along With The Construction Of Concrete Footings; 9) Construction Of Street Elements, Including Stone And Concrete Curbs And Concrete Edges Along With Concrete Footings; 10) Construction And Reconstruction Of Culverts Under Exits And Under The Road, Including The Demolition Of Existing Culverts, Construction Of Excavations, Aggregate Foundations, Culverts Made Of Pehd Pipes Of Various Diameters, Backfills And Strengthening The Inlets And Outlets With Stone Blocks; 11) Construction Of Stormwater Sewage Networks And Connections, Including The Demolition Of Existing Wells And Manholes, Construction Of Excavations, Bases And Backfills, Channels Made Of Pp And Pvc Pipes, Inspection Wells, Sewage Wells And Strengthening Of Inlets And Outlets; Including Tv Inspection And Tightness Tests; 12) Renovation Of The Existing M-1 Bridge Structure, Including Dismantling The Existing Protective Railings, Renovation Of Reinforced Concrete Caps And Construction Of A Bridge Barrier Railing; 13) Execution Of A Resin Strip On The Bridge Structure, Including Preparation And Cleaning Of The Existing Subfloor, Application Of Priming And Leveling Layers, And Execution Of A Polyurethane-Epoxy Resin Surface, In Accordance With The Manufacturers Technology; 14) Restoration Of Roadside Ditches, Including Earthworks, Formation Of Slopes And The Bottom Of The Ditches And Their Profiling; 15) Construction Of Embankments Including The Purchase And Delivery Of Material As Well As The Formation
|