1. The Subject Of The Order Is The Execution Of Construction Works For An Investment Involving The Expansion Of A Single-Family Residential Building Into A Center For The Integration And Activation Of Elderly And Disabled People, Along With The Necessary Technical Infrastructure, A Gas Tank, Landscaping In Stary Folwark And Changing The Method Of Use.2. The Subject Of The Order Includes In Particular: A) Complete Demolition Of All External Walls, Except For The Wall On The Eastern Side; B) Construction Of New Walls Of The Designed Building From 24 Cm Ceramic Blocks Along With Insulation And A Facade Layer; C) Reconstruction, Demolition And Replacement Of All Existing Foundations; D) Demolition Of All Internal Walls And Construction Of New Ones In Accordance With The Design Documentation; E) Dismantling And Dismantling Of All Ceilings Of The Existing Building And Construction Of Suspended Ceilings Made Of Plasterboards On An Aluminum Grid, Mounted To The Structure Of Wooden Trusses; F) Disassembly Of All Layers Of The Existing Roof, In The Newly Designed Intention, Construction Of A Roof On The Structure Of Wooden Trusses; G) Comprehensive Replacement Of Window And Door Joinery; H) Tearing And Dismantling Of All Existing Floor Layers. And Construction Of New Floors Made Of Ceramic Or Stoneware Tiles And Floor Panels; I) Construction Of Internal Installations: Heating - Gas Furnace With A Designed Liquid Gas Tank With A Capacity Of 4850L; Hot And Cold Water - Existing Water Supply Connection; - Electric 230/400 V; - Sanitary Sewage System - Existing Ks160 Connection On The Plot; Mechanical Ventilation With Heat Recovery; Telecommunications Installation;J) Construction Of Mechanical Ventilation Based On Supply And Exhaust Ventilation Units With Heat Recovery On Rotary, Counter-Current And Glycol Exchangers, And Exhaust From The Toilet Based On Duct Fans;K) Replacement Of The Fence Around The Entire Perimeter, Construction Of A Double-Leaf Entrance Gate And A Fence Gate;L) Tidying Up And Restoring The Construction Site (I.E. The Plot Where The Works Were Carried Out And Adjacent Areas, If They Were Disturbed By The Contractor During The Implementation Of The Subject Of The Agreement) To The Pre-Construction Condition Or Better (In Particular, Repairing The Hardened Surface In The Event Of Disturbance, Sifting Out Grass, Removing Vegetation); M) Basic Dimensions After The Implementation Of The Planned Expansion Of The Building Are: Width - 13.38 M, Length - 28.22 M, Ridge Height (From The Ground Level At The Lowest Entrance To The Building) - 7.50 M; Gable Roof With An Angle Of Inclination Of The Roof Slopes Of 35;N) Category Of Building Structure Ix. Before Installing Materials, The Contractor Should Obtain The Approval Of The Ordering Party/Supervisory Inspector For The Material/Device Intended For Installation.3. The Task Is Co-Financed In Accordance With The Contract No. Fepd.04.04-Iz.00-0003/25-00 For Co-Financing The Project Center For The Inte
Contact Information
Address
Gmina Suwałki,Suwałki,16-400,Podlaskie,Pl843 - Suwalski
Contact No.
875659300
Email
sekretariat@gmina.suwalki.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 117271951
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.