|
1. The Order Involves The Implementation Of An Investment Called Modernization Of The Boiler Room In The Building Of Primary School No. 1 In Brenna Leśnica, In Accordance With The Documentation, I.E.: - Architectural And Construction Design And Technical Design For The Construction Of An Internal Gas Installation In The Building Of Primary School No. 1 In Brenna Leśnica, As Well As The Technical Specification For The Execution And Acceptance Of Works And The Bill Of Quantities Prepared By The Company Usługi Projektowe Małgorzata Wysłych Based At Ul. Fabryczna 9, 43-430 Skoczów, - A Technical Design For The Modernization Of The Boiler Room In The Building Of Primary School No. 1 In Brenna Leśnica In The Scope Of Technological Installation, As Well As A Technical Specification For The Execution And Acceptance Of Works And A Bill Of Quantities Prepared By Biuro Projektów Instaleco Roman Zabdyr With Its Registered Office At Ul. Staffa 3A, 43-450 Ustroń, Constituting An Integral Part Of Swz. 2. The Investment Includes The Construction Of An Internal Gas Installation In The Building Of Primary School No. 1 In Brenna Leśnica, Including The Reconstruction Of The Gas Installation From The Reduction And Measurement Node Located On The Outer Wall Of The Building To The Gas Boiler Room In The Basement Of The Building And The Modernization Of The Technological Installation Of The Gas Boiler Room Supplying Heat For The Central Heating Installation And For The Preparation Of Hot Water. The Scope Of The Task Includes: - Dismantling The Existing Gas Installation (Steel Pipelines, Steam Traps And Gas Taps, Gas Meters, Approaches To Gas Meters And Dismantling Of The Gas Box), - Construction Of Gas Pipelines - Steel With Welded Connections Along With The Construction Of Approaches To Gas Meters And Installation Of Straight-Through Gas Taps, - Integration Of The Apartment And Kitchen Into The Existing Gas Installation, - Installation Of A Gas Cabinet And A Mag Valve Cabinet, - Assembly Mag3 Solenoid Valve And Electric Control System, - Installation Of A System For Measuring Chemical Parameters Of Humidity Or Gas Concentration, - Disassembly Of Existing Gas Boilers, Expansion Vessel, Heater, Circulation And Circulation Pumps And Hydraulic Coupling, - Dismantling Of The Flue And Supply Duct Along With Dismantling Of Steel Pipelines, - Demolition Of The Boiler Foundation, - Filling The Cement Floor And Building A New Foundation For The Heater, - Execution Of Works Preparatory Works Related To The Modernization Of The Gas Boiler Room, - Installation Of Cascade Condensing Gas Boilers (4 X 60 Kw) Along With The Automation System And Cabling, - Installation Of Safety Valves, Centrifugal Pumps, Filters, Valves, Flanged Dampers, Hydraulic Coupling, Condensate Neutralizer And Pressure Gauge, - Installation Of Pipelines And Steel Fittings In Thermal Insulation, - Installation Of A Separator Sludge And Microbubbles, - Installation Of An Expansion Vessel, A Dismantled Capacitive
|