Structural Shell Work – Replacement Building For The Wilhelm-Gymnasium Sports Hall - Expanded Shell Work_Ms. The Services Include In Particular Earthworks, Dewatering, Reinforced Concrete, Prefabricated Parts, Masonry And Sealing Work For The Production Of The Foundation And The Supporting Structure. Also Included Are Buried Cables And Building Penetrations, The Earthing System, Electrical Installation Parts, Concrete Cosmetics As Well As The Associated Planning, Testing And Verification Services. Scope Of The Service: • Earthworks Including Excavation, Subgrade, Filling And Disposal • Open Dewatering • Buried Sewage, Drinking Water And Heating Pipes • Floor Drains, Casing Pipes, Annular Space Seals And Building Penetrations • Ring And Foundation Earthing Including Potential Equalization • Clean Layers And Foundation Components • Waterproof Floor Slab Including Joint Sealing • In-Situ Concrete And Reinforced Concrete Work • Exposed Concrete Components Of Class Sb 2 • Formwork, Supporting Scaffolding And Temporary Supports • Reinforcing Steel And Reinforcing Steel Mesh • Prefabricated Stairs And Prefabricated Supports • Sand-Lime Brickwork • Additional Bituminous Sealing Of The Waterproof Floor Slab • Concrete Cosmetics, Blasting Work And Mineral Concrete Glazes • Recycled Concrete And Qng Verification • Empty Pipes And Installation Boxes For Electrical Engineering • Scaffolding, Verification And Hourly Wage Work Essential Parts Of The Construction Work To Be Awarded: Earthworks On The Ground Loosen And Convey Approx. 1,089 M³ Of Earthworks Produce Subgrade Approx. 1,425 M² Disposal Recycle Or Dispose Of Soil And Stones Approx. 2,050 T Of Dewatering Open Dewatering 8 Weeks Provision, 30 Days Operation Drainage Sewer Pipes Dn 110 To Dn 160 Approx. 195 M Earthing System Ring And Foundation Earth Electrodes Approx. 1,010 M Foundation Clean Layer Made Of Concrete, 10 Cm Thick Approx. 1,216 M² Foundation Perimeter Insulation Under The Floor Slab Approx. 1,158 M² Reinforced Concrete Work Waterproof Floor Slab, 25 Cm Thick Approx. 1,158 M² Reinforced Concrete Work In-Situ Concrete Ceilings Including Inclined Ceilings Approx. 1,413 M² Reinforced Concrete Work In-Situ Concrete Walls, Predominantly Exposed Concrete Class Sb 2 Approx. 1,243 M² Supporting Scaffolding Supporting Scaffolding For Ceilings Up To A Height Of Approx. 8.50 M Approx. 1,472 M² Reinforcement Of Reinforcing Bars And Reinforcing Steel Meshes Approx. 246 T Sustainability Allowance For Recycled Concrete Approx. 350 M³ Prefabricated Parts Prefabricated Reinforced Concrete Stairs 4 Pieces Prefabricated Parts Prefabricated Reinforced Concrete Supports 16 Pieces Masonry Work Sand-Lime Brick Masonry Approx. 162 M² Sealing Work Sealing The Waterproof Floor Slab And Wall Base Approx. 1,277 M² Electrical Engineering Empty And Protective Pipes In The Concrete Or Soil Approx. 1,800 M Electrical Engineering Installation And Switch Junction Boxes In The Concrete Approx. 480 Pieces Of Exposed Concrete Work Blasting And Minerali. Glazing Of Exposed Concrete Surfaces Approx. 1,256 M²
|