1. The Subject Of The Order Is Asphalting Of Roads In The Gromnik Commune: 1) Rubber Surface Of The Internal Road In The Town Of Gromnik On Plots No. 980/6, 981/1, Total Section Of 115 Meters; 2) Asphalting Of The Commune Road In Gromnik On Plot No. 1658, 1657/2, 1197/2, 1198/6, 1656, 1655, 1198/4 Total Section 305 M. (Ul. Widok);3) Asphalting The Internal Road In Siemiechów On Plot No. 749, Total Section Of 370 M. (In The Direction Of Pres, Stage Ii);4) Asphalting The Internal Road In The Town Of Rzepiennik Marciszewski On Plot No. 327/2, 329/1, 329/2, 330/2, Total Section 119 M.;5) Asphalting The Internal Road In Gromnik On Plot No. 119/13, Total Section 160 M. (Parkowa In The Direction Of Maślak);6) Asphalting The Municipal Road In The Town Of Gromnik On Plots No. 267/1, 1392, Total Section Of 80 M. (Ul. Tarnowska);7) Asphalting The Internal Road In Golanka On Plots No. 241, 240, 230/9, 107/20, 107/24, 107/30, 107/27, 230/6, 230/11, Total Section 370 M.;8) Asphalting The Internal Road In Chojnik On Plot No. 536/3, 536/5, 548/4, Total Section 140 M.;9) Asphalting The Internal Road In Chojnik, Plot No. 968, Total Section 45 M.;10) Asphalting The Internal Road In Brzozowa, Plot No. 815, Total Section 308 M. (In The Direction Of Wójcik);11) Asphalting The Internal Road In The Town Of Brzozowa On Plots No. 587/2, 588/2, 1195, 1196, 1197, Total Section Of 250 M. (Towards Gniadek);12) Asphalting The Internal Road In The Town Of Polichty On Plots No. 457 And 458, Total Section Of 160 M. (Sucha Góra).2. The Scope Of The Subject Of The Order Includes: 1) Substructures; 2) Surfaces; 3) Roadsides, Which Is Specified In Detail In The Attached Bill Of Quantities. 3. A Detailed Description Of The Subject Of The Order Is Specified In The Detailed Technical Specification For The Execution And Acceptance Of Construction Works (Sst) And The Bill Of Quantities. 4. Final Remarks: 1) The Contractor Will Perform Construction Works In Accordance With The Conditions For Execution And Acceptance Of Works Specified In The Sst, With Due Care, In Accordance With Currently Applicable Regulations, Technical Norms, Standards, Principles Of Construction Practice, Professional Ethics And The Terms Of The Draft Contract /Appendix No. 7/, 2) The Contractor Will Provide Appropriate Security And Marking Of The Works On His Own, 3) During The Implementation Of The Works, The Contractor Will Maintain The Construction Site In A Condition Free From Traffic Obstacles And Will Remove And Store All Auxiliary Devices On Its Own And At Its Own Expense,4) The Contractor Will Be Fully Liable For Damages And Consequences Of Accidents Of Employees And Third Parties Arising In Connection With The Construction Works Carried Out In The Period From The Date Of The Protocol Takeover Of The Construction Site By The Contractor To The Date Of Final Acceptance Of The Works,5. Pursuant To Art. 101 Section 4 Of The Public Procurement Act If The Swz And Annexes To The Swz, I.E. Documents Describing The Su
|