Demolition Work – 084 Demolition, Dismantling And Pollutant Remediation Work - Sz Gundelfingen, 8. Ba, Kandelstraße 47, 79194 Gundelfingen. Foil Walls Approx., 90M², Foil Doors 6 Pieces, Construction Of Temporary External Wall Approx. 250 Linear Meters, Personal Decontamination Unit 1 Piece, Locker Cabinets 9 Pieces, Blackboard Systems 14 Pieces, Curtains 200 Linear Meters, Signage 35 Pieces, Clocks 20 Pieces, Wooden Doors 25 Pieces, Glass Skylights / Metal Stud Wall, Planked, Partly Room-High With Kmf Core Insulation Approx. 380 M², Glass Walls 20 M², Grid Ceiling Approx. 1,000 M², Metal Slatted Ceiling 1,000 M², Kmf Insulation Layers, Pollutants, 2,000 M², Needle Felt Floor Coverings Approx. 1,200 M², Rubber Floor Coverings Approx. 500 M², Tiled Coverings Approx. 150 M², Wastewater Drinking Water Pipes Approx. 280 Running Meters, Washbasins 25 Pieces, Various. Loose Furniture: Tables, Chairs, Cupboards, Shelves, Toilet Partitions 65 Linear Meters, Heating Cables Approx. 250 Pieces, Tube Radiators Approx. 100 Pieces, Ventilation Ducts/Pipes Approx. 400 M, Electrical Cables/Cable Routes Psch, Arcade Steel Supports 70 Pieces, Arcade Railings/Sun Protection Approx. 260 Linear Meters, Prefabricated Reinforced Concrete Parts Approx. 700 M², Masonry Walls Approx. 125 M², Metal Sandwich Glass Facade, Kmf Core Insulation Approx. 900 M², Various Insulation Approx. 200 M²,
|